Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹6.4 L+₹1.7 L (34.8%)Rejected-AOC B 47 RAMABHATHIRAR STREET THIRUNAGAR THIRUPARANKUNDRAM MADURAI 625006 | MADURAI | TAMIL NADU | 625006 | L2 | Rejected-AOC Rejected | |
| 3 | L3₹6.6 L+₹1.9 L (39.0%)Rejected-AOC | L3 | Rejected-AOC Rejected | |
| 4 | L4₹6.9 L+₹2.1 L (44.6%)Rejected-AOC | L4 | Rejected-AOC Rejected | |
| 5 | L5₹7.0 L+₹2.2 L (46.8%)Rejected-AOC | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | V.Sekaran L6 | SLS CONSTRUCTION L5 | Panner selvam g L10 | SRI KRISHNA CONSTRUCTION L2 | J.Pandiyan L7 | V.UDAYAKUMAR L9 | DMBUILDERS L4 | S.Sathish kumar L3 | Manjunathan L1 | K.Rajini L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00VELLORE DISTRICT Construction of RCC Slab Culvert at Near Sembedu Govt. High School in Sembedu Panchayat of Gudiyatham Block. | |||||||||||||
| 2.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 122.62 | Cu.M | 210 ₹25,750.2 | 250.17 ₹30,675.85 | 313.6 ₹38,453.63 | 230.4 ₹28,251.65 | 135 ₹16,553.7 Lowest | 275 ₹33,720.5 | 200 ₹24,524 | 199 ₹24,401.38 | 214.83 ₹26,342.45 | 259.78 ₹31,854.22 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 5.16 | Cu.M | 4,458 ₹23,003.28 | 3,300.57 ₹17,030.94 | 4,116 ₹21,238.56 | 3,024 ₹15,603.84 | 5,100 ₹26,316 | 5,623 ₹29,014.68 | 4,000 ₹20,640 | 4,194 ₹21,641.04 | 2,001.66 ₹10,328.57 Lowest | 3,409.56 ₹17,593.33 |
| 4.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 247.4 | Sq.M | 436 ₹1,07,866.4 | 324.57 ₹80,298.62 | 411.6 ₹1,01,829.84 | 302.4 ₹74,813.76 | 262 ₹64,818.8 | 600 ₹1,48,440 | 325 ₹80,405 | 410 ₹1,01,434 | 240.97 ₹59,615.98 Lowest | 340.96 ₹84,353.5 |
| 5.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 14.67 | Sq.M | 872 ₹12,792.24 | 376.65 ₹5,525.46 | 470.4 ₹6,900.77 | 345.6 ₹5,069.95 | 500 ₹7,335 | 600 ₹8,802 | 300 ₹4,401 | 820 ₹12,029.4 | 261.1 ₹3,830.34 Lowest | 389.66 ₹5,716.31 |
| 6.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 67.65 | Cu.M | 5,578 ₹3,77,351.7 | 5,343.78 ₹3,61,506.72 | 6,664 ₹4,50,819.6 | 4,896 ₹3,31,214.4 | 6,290 ₹4,25,518.5 | 5,550 ₹3,75,457.5 | 6,000 ₹4,05,900 | 5,248 ₹3,55,027.2 | 3,504.64 ₹2,37,088.9 Lowest | 5,520.24 ₹3,73,444.24 |
| 7.00 | Supplying and fabrication of Steel to site and all labour charges for straightening, cutting to length, including all Cost and conveyance of labour charges etc.,Complete., | 0.35 | MTs. | 73,254 ₹25,638.9 | 61,296.3 ₹21,453.71 | 76,440 ₹26,754 | 56,160 ₹19,656 | 90,000 ₹31,500 | 88,000 ₹30,800 | 75,000 ₹26,250 | 68,931.4 ₹24,125.99 | 20,479.4 ₹7,167.79 Lowest | 63,320.4 ₹22,162.14 |
| 8.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 3.31 | Cu.M | 7,575 ₹25,073.25 | 6,520.74 ₹21,583.65 | 8,134 ₹26,923.54 | 5,976 ₹19,780.56 | 7,900 ₹26,149 | 5,000 ₹16,550 Lowest | 7,000 ₹23,170 | 7,127.85 ₹23,593.18 | 5,044.09 ₹16,695.94 | 6,737.94 ₹22,302.58 |
| 9.00 | Letering and Painting Name board | 1 | No. | 797 ₹797 | 56,440.99 ₹56,440.99 | 70,385.15 ₹70,385.15 | 51,711.54 ₹51,711.54 | 1,000 ₹1,000 | 1,000 ₹1,000 | 500 ₹500 Lowest | 749.5 ₹749.5 | 44,031.37 ₹44,031.37 | 58,304.76 ₹58,304.76 |
| 10.00 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Each | 1,07,689.13 ₹1,07,689.13 | 1,07,012.87 ₹1,07,012.87 | 1,33,794.92 ₹1,33,794.92 | 98,298.31 ₹98,298.31 | 1,07,854.38 ₹1,07,854.38 | 1,15,881.24 ₹1,15,881.24 | 1,05,442.2 ₹1,05,442.2 | 1,01,340.3 ₹1,01,340.3 | 72,918.24 ₹72,918.24 Lowest | 1,10,831.59 ₹1,10,831.59 |
Tender Value
Refer Docs
EMD Value
₹17,900
Closing Date
13 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPEMETN OFFICER (BP)
PANCHAYAT UNION OFFICE, GUDIYATHAM BLOCK
onstruction of RCC Slab Culvert at Near Sembedu Govt. High School in Sembedu Panchayat of Gudiyatham Block.
2026_RDTN_709254_1
A3 / 2582 / 2026
Open Tender
Civil Works
Item Rate
GUDIYATHAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹17,900
Yes
11 Nov 2026
30 Sept 2026
13 Oct 2026
30 Sept 2026
13 Oct 2026
30 Sept 2026
150 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | VELLORE DISTRICT Construction of RCC Slab Culvert at Near Sembedu Govt. High School in Sembedu Panchayat of Gudiyatham Block. | - | - | - | - |
| 2 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 122.62 | Cu.M | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 5.16 | Cu.M | - | - |
| 4 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 247.4 | Sq.M | - | - |
| 5 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 14.67 | Sq.M | - | - |
| 6 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 67.65 | Cu.M | - | - |
| 7 | Supplying and fabrication of Steel to site and all labour charges for straightening, cutting to length, including all Cost and conveyance of labour charges etc.,Complete., | 0.35 | MTs. | - | - |
| 8 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 3.31 | Cu.M | - | - |
| 9 | Letering and Painting Name board | 1 | No. | - | - |
| 10 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Each | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_852295.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
Tendernotice_2.pdf
PDF • 0.45 MB
BOQ_852295.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .