| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | ₹9.2 L | L1 | Accepted-AOC Low |
| 2 | L2₹9.6 LRejected-Finance | ₹9.6 L | L2 | Rejected-Finance High |
| 3 | L3₹9.8 LRejected-Finance | ₹9.8 L | L3 | Rejected-Finance High |
| 4 | L4₹10.1 LRejected-Finance | ₹10.1 L | L4 | Rejected-Finance High |
| 5 | L5₹11.5 LRejected-Finance | ₹11.5 L | L5 | Rejected-Finance High |
| Sl No | Description | Qty | Unit | MALATHI L1 | Lokesh.S L4 | B Sabari Contractor L2 | NITHYA CONSTRUCTION L6 | M/S ASL ENTERPRISE L3 | R Murugan L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Strening Wall from Exiting Open Well in Kailasa Eri at Devigapura | |||||||||
| 1.01 | Earth work excavation in Hard stiff gravely soil for narrow foundation with initial lead and lift as per SS 20 B,etc complete | 107.54 | Cum | 210 ₹22,583.4 | 220 ₹23,658.8 | 278 ₹29,896.12 | 265 ₹28,498.1 | 188.05 ₹20,222.9 Lowest | 260 ₹27,960.4 |
| 1.02 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL. | 4.03 | Cum | 4,530 ₹18,255.9 | 5,600 ₹22,568 | 4,650 ₹18,739.5 | 5,605 ₹22,588.15 | 4,145.7 ₹16,707.17 Lowest | 5,603 ₹22,580.09 |
| 1.03 | RCC in M 30 Design mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete | 57.57 | Cum | 7,250 ₹4,17,382.5 | 8,050 ₹4,63,438.5 | 7,200 ₹4,14,504 Lowest | 9,038 ₹5,20,317.66 | 8,778.63 ₹5,05,385.73 | 9,034 ₹5,20,087.38 |
| 1.04 | Steel Centering, soffits of RCC works including strutting and shuttertting Charges etc. complete for the following Upto Basement | 208.08 | Cum | 430 ₹89,474.4 | 385 ₹80,110.8 | 496 ₹1,03,207.68 | 548 ₹1,14,027.84 | 380.37 ₹79,147.39 Lowest | 546 ₹1,13,611.68 |
| 1.05 | Supply, fabrication, placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods. | 3.16 | MT | 73,600 ₹2,32,576 | 84,500 ₹2,67,020 | 78,000 ₹2,46,480 | 91,964 ₹2,90,606.24 | 66,049.16 ₹2,08,715.35 Lowest | 91,962 ₹2,90,599.92 |
| 1.06 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,40,449 ₹1,40,449 Lowest | 1,54,223 ₹1,54,223 | 1,46,309 ₹1,46,309 | 1,75,687 ₹1,75,687 | 1,49,432 ₹1,49,432 | 1,75,471 ₹1,75,471 |
Tender Value
₹11.6 L
EMD Value
₹12,000
Closing Date
11 Aug 2026, 3:00 pmClosed
The Block Development Officer, West Arni
The Block Development Officer,V.Pt, West Arni
Construction of Strening Wall from Exiting Open Well in Kailasa Eri at Devigapuram Panchayat in West Arni Block of Tiruvannamalai District Vpt GF 2026-2027
2026_RDTN_688920_1
Roc. No. A5/2348/2025 Dt. 03.07.2026
Open Tender
Civil Works
Lump-sum
180 days
West Arni
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,000
Yes
The Block Development Officer,V.Pt, West Arni
11 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Strening Wall from Exiting Open Well in Kailasa Eri at Devigapura | |||||
| 1.01 | Earth work excavation in Hard stiff gravely soil for narrow foundation with initial lead and lift as per SS 20 B,etc complete | - | Cum | 1.25 | - |
| 1.02 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL. | - | Cum | - | - |
| 1.03 | RCC in M 30 Design mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete | - | Cum | 100 | - |
| 1.04 | Steel Centering, soffits of RCC works including strutting and shuttertting Charges etc. complete for the following Upto Basement | - | Cum | 53 | - |
| 1.05 | Supply, fabrication, placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods. | - | MT | 11 | - |
| 1.06 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount (in Rupees) | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tenderdocument.pdf
Tender Documents • 0.88 MB
BOQ_828126.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].