Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹10.7 L+₹11,508.54 (1.09%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹10.7 L
EMD Value
₹11,000
Closing Date
1 Oct 2024, 3:00 pmClosed
Block Development officer
BDO Office Uthangarai
Krishnagiri District Uthangarai Block Under Repairs and Renovation of School Building RCC Roof at Andiyur PUMS North Facing,Repairs and Renovation of School Building RCC Roof at Andiyur PUMS West Facing at Eggoor Panchayat Package No UTG25
2024_RDTN_488299_1
ROCNO2793_2024_R4_06_09_2024
Open Tender
Civil Works - Others
Item Rate
180 days
Uthangarai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹11,000
BDO Office Uthangarai
29 Oct 2024
26 Sept 2024
1 Oct 2024
26 Sept 2024
1 Oct 2024
26 Sept 2024
28 Sept 2024
Amount
1. Repairs and Renovation of School Building RCC Roof @ Andiyur PUMS ( North Facing ) H/o Eggoor Estimate Amount : 5.310 Lakhs
Towards chipping and roughening the concrete surfaces including all cost and conveyance of men and materials
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Painting two coats with approved Black Oxide for Old Black board
Towards attending repairs to doors
Towards attending repairs to windows
Wiring with 2 x 1.5 sq.mm (22 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with 150 x 100 x 113mm TW switch box for 5A 3 pin non inter locking Wall socket with 5A flush type switch with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for open PVC plug point SD 36
Supply and fixing of WT bulk head fitting with guard for 11W CFL SD 83
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 110
4' 18W Crystal Glass LED Tube Light Fitting(M-1211)
CUPBOARDS REPAIRS/ NEW CONSTRUCTION
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be gotapproved from the Executive Engineer befoe use on work.
CONSTRUCTION OF CHAPPAL RACK OUTSIDE THE CLASS
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
Towards RWH
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Collection and supply of sand filling into the basement including cost and conveyance to the site and all labour charges.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Collection and supply of filling the stones in soakpit including cost and conveyance of materials to the work site and all labour charges.
40 mm metal
20 mm metal
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Provisions for supply and fixing of precast RCC cover slab including cost and conveyance of materials and all labour charges
Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification.
Towards for Bala Painting
Towards drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Shorter Wall
Longer Wall
Verandah pillars painting with MORAL VALUES(both English and Tamil)
Verandah Wall painting with TYPES OF GEOMETRICAL SHAPES with names both Tamil and English
Ceiling with Solar system painting including scaffolding charges, glitter paints, brushesetc., including all cost and conveyance of men and materials etc., all complete
Towards drawing clock dial with movable longer and shorter arm fixed with central achor nail inlcuding all cost and conveyance of men and materials etc.,
Towards drawing ENNUM EZHUTHUM logo inlcuding all cost and conveyance of men and materials etc.,
Providing String bandal including all cost and conveyance of men and materials etc complete
Provision for Fire board Charges
Provision for Name Board charges
Provision for Photo Charges
2 .Repairs and Renovation of School Building RCC Roof @ Andiyur PUMS ( West Facing ) H/o Eggoor Estimate Amount : 5.360 Lakhs
Towards clean removal of damaged plastering surfaces including all cost and conveyance of men and materials
Dismantling of Brickwork in Cement mortor including all cost and conveyance of men and materials etc/. All complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Towards chipping and roughening the concrete surfaces including all cost and conveyance of men and materials
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Dismantling of pressed tiles & weathering course including all cost and conveyance of men and materials etc/. All complete
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Painting two coats with approved Black Oxide for Old Black board
Towards attending repairs to doors
Towards attending repairs to windows
Provision for Electrification
Wiring with 2 x 1.5 sq.mm (22 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with 150 x 100 x 113mm TW switch box for 5A 3 pin non inter locking Wall socket with 5A flush type switch with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for open PVC plug point SD 36
Supply and fixing of WT bulk head fitting with guard for 11W CFL SD 83
Supply and fixing of 16A DP switch of 500V with matal clad with fuse and neutral (side handle) on suitable TW board with earth connection only Supply and fixing of DPI main switch SD no 142
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 110
4' 18W Crystal Glass LED Tube Light Fitting(M-1211)
CUPBOARDS REPAIRS/ NEW CONSTRUCTION
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be gotapproved from the Executive Engineer befoe use on work.
CONSTRUCTION OF CHAPPAL RACK OUTSIDE THE CLASS
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
Towards for Bala Painting
Towards drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Shorter Wall
Longer Wall
Verandah pillars painting with MORAL VALUES(both English and Tamil)
Verandah Wall painting with TYPES OF GEOMETRICAL SHAPES with names both Tamil and English
Ceiling with Solar system painting including scaffolding charges, glitter paints, brushesetc., including all cost and conveyance of men and materials etc., all complete
Towards drawing clock dial with movable longer and shorter arm fixed with central achor nail inlcuding all cost and conveyance of men and materials etc.,
Towards drawing ENNUM EZHUTHUM logo inlcuding all cost and conveyance of men and materials etc.,
CONSTRUCTION OF RAMP
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Fillling in basement with excavated earth layers of not more than 15cm thick,well rammed, watered and compacted, complying with standard specification etc., complete.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.
Towards RWH
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Collection and supply of sand filling into the basement including cost and conveyance to the site and all labour charges.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Collection and supply of filling the stones in soakpit including cost and conveyance of materials to the work site and all labour charges.
40 mm metal
20 mm metal
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Provisions for supply and fixing of precast RCC cover slab including cost and conveyance of materials and all labour charges
Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification.
Providing String bandal including all cost and conveyance of men and materials etc complete
Provision for Fire board Charges
Provision for Name Board charges
Provision for Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sun Engineering (BID ID -1152681)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .