Loading…
Loading…
Tender Value
₹4.1 Cr
EMD Value
₹8.3 L
Closing Date
13 Jul 2026, 3:00 pm5d left
Stripping, Scraping, Cleaning, Washing and Painting of LHB Bogies and their Components during SS-I, including Fitment of Air Springs on LHB Bogies and Pre- stripping of LHB bogies before Lifting of coaches as per Scope of Work at Lower Parel Workshop.
ER-PL-ME-EST-739645-A
ER-PL-ME-EST-739645-A
Open
36 Months
Pratapgarh, Rajasthan
₹0
₹8.3 L
16 Jun 2026
16 Jun 2026
29 Jun 2026
A-Stripping, Cleaning, Scrapping and washing of LHB Bogies and its
Stripping, Cleaning, Scrapping and washing of LHB Bogies and its components during SS-I, as per scope of work at Lower Parel workshop. (Unit = Nos. of bogies). (Rates are inclusive of GST)
B-Painting of LHB Bogies and its components during SS- I as per scope
Painting of LHB Bogies and its components during SS- I as per scope of work at Lower Parel workshop. (Unit = Nos. of bogies). (Rates are inclusive of GST)
C-Fitment of Air Spring on LHB Bogies (Unit = Nos. of Air Springs).
Fitment of Air Spring on LHB Bogies (Unit = Nos. of Air Springs). (Rates are inclusive of GST)
D-Pre stripping of LHB Bogies before lifting of LHB Coaches. (1 Coach
Pre stripping of LHB Bogies before lifting of LHB Coaches. (1 Coach set consist of 02 Nos. of Bogies). (Rates are inclusive of GST)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_IndianRailways-April-2022.pdf
ATTACHMENT
Correctionslip1-11_compressed.pdf
ATTACHMENT
TDLhbSS116062026.pdf
ATTACHMENT
Download all tender documents and submit your bid