Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.4 L+₹24.27 (0.01%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L2₹2.4 L+₹24.27 (0.01%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,850
Closing Date
10 Aug 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_316503_5
e-NIT No. 53 REW UDHAMPUR of 2026-27 Dated 17-07-2026
Open Tender
Civil Works
Percentage
30 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹4,850
19 Aug 2026
17 Jul 2026
11 Aug 2026
17 Jul 2026
10 Aug 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add Cost of Sign Board | 1 | No. | 3,000 | ₹3,000 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 137.5 | cum | 91.75 | ₹12,615.63 |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 8.8 | cum | 4,826.5 | ₹42,473.2 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 6.7 | cum | 5,733.6 | ₹38,415.12 |
| 5 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 1.94 | cum | 937.9 | ₹1,819.53 |
| 6 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) . | 100 | cum | 971.15 | ₹97,115 |
| 7 | Dry Stone Solling nallah stone | 4.01 | Cum | 1,235.55 | ₹4,954.56 |
| 8 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 59 | Sqm | 286.35 | ₹16,894.65 |
| 9 | Carriage of sand | 8.75 | Cum | 1,537.5 | ₹13,453.13 |
| 10 | Carriage of Bajri | 14.9 | Cum | 523.4 | ₹7,798.66 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1032021.xls
BOQ • 0.24 MB
extensionfinal.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .