Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance 249 LIG PREETAM NAGAR ALLAHABAD UTTAR PRADESH PIN 211011 | ALLAHABAD | ALLAHABAD | UTTAR PRADESH | 211011 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
22 Jun 2026, 3:00 pmClosed
DIRECTOR
MNNIT Allahabad, Prayagraj-211004
Supply, installation, testing and commissioning 30 kVA UPS and Battery in Signature lab (ECED).
2026_MNNIT_912844_1
07/ESWM/2026-27
Limited
Electrical Works
Item Rate
60 days
Academic Campus MNNIT Allahabad
Please refer Tender documents
2 documents required · 2 mandatory
₹0
Exempted
23 Jun 2026
12 Jun 2026
23 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply, installation, testing and commissioning of 30 kVA UPS and Battery in Signature lab (ECED). | |||||
| 1.01 | Supply, installation, testing and commissioning of 30 kVA with 36 nos. 64 Ah battery backup 40 min. , backup DC Breaker, DC cable UPS and battery warranty 2 years on UPS and battery 30 Kva. Make- Pegasu, Mitsubishi, ABB, apc, Elnova. | 1 | No | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
TenderFormEN07.pdf
Tender Documents • 0.41 MB
BOQ_959336.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .