| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.7 LAccepted-Finance 145 JUGRAJPUR JUGRAJPUR SACHANDI KANPUR NAGAR UTTAR PRADESH 209304 | KANPUR NAGAR | UTTAR PRADESH | 209304 | 1 | Accepted-Finance Accepted | |
| 2 | 2₹23.5 L+₹1.8 L (8.44%)Accepted-Finance B 82 GF SOUTHEND FLOORS SOHNA ROAD SECTOR 48 49 GURGAON HARYANA 122018 | GURUGRAM | HARYANA | 122018 | 2 | Accepted-Finance Accepted | |
| 3 | 3₹27.1 L+₹5.4 L (25.1%)Accepted-Finance 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | 3 | Accepted-Finance Accepted |
Tender Value
₹29.2 L
EMD Value
₹30,000
Closing Date
24 Jun 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC-I, Kanpur
SE ETC-I, Kanpur
Work
2022_UPTCL_706700_1
ET-39/ETC-I(K)/2022-23
Open Tender
Electrical Works
Fixed-rate
365 days
Kanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
PNB Account No 0727002100004177
₹30,000
30 Jun 2022
8 Jun 2022
25 Jun 2022
8 Jun 2022
24 Jun 2022
8 Jun 2022
120 days
Amount
Tower to Tower ground patrolling of 400 KV Unnao-agra Transmission Line including identification of missing Tower parts, Nut-Bolt, Faulty Discs/Polymer, Fulty Jumpers, Earthwire and conductor etc. and any kind of dangerous aspect observrd in the line, back filling to earth around the legs and suporting the same to concerned SDO/JE on prescribed performa of patrolling including notifying the trees existing in the corridor and branches infringing the corridor etc. For petroling work all labour, skilled technician, Literate staff/Superviser duly equipped with binocular of line is to be done by every Monthly basis at 12 times in a year, Total length of line 280x12.
Lopping Chopping of branches of different type of trees infringing the corridor of the 400 KV Unnao- Agra Line is to be done. Above work is to be carried out by adhering due precautions, care and safety of men and material and avoiding damage of crops, building ,power line etc. situated in the vicinity various trees falling in the corridor of line.
Cutting of different type of trees existing within the 52 mtr. Corridor of 400 KV Unnao-Agra line is to be done. Above work is to be carried out by adhering due precautions care and safety of men and material and avoiding damage of crops, building,power line etc. Situated in the vicinity. Contractor has to ensure that the wood of trees to be handed over to owner of tree at site.
Tree having trunk up to 0.5 mtr Circumference.
Tree having trunk up to 0.5 mtr to 1.0 mtr Circumference.
Replacement of Stolen/Missing members including carriage, fabrication, fixing and welding of nuts and bolts and dismantling of remainig cut pices uf theft tower parts, including cost of all required labour, T&P, Vehicle for carriage required for completion of work in the 400 KV Unnao-Agra Line.
Emergency based tower to tower ground patrolling on observed of Tripping/ Breakdown of 400 KV Transmission Line. Contractor has to carried out ground work I.e. Lopping/Chapping of trees infringing to corridor, Identification of missing tower parts, nuts-bolts Faulty discs insulater, damaged conductor, tower earthing and other dangererous aspaects observed in the line . Patrolling will be started from sikandra kanpur dehat to the place of fault. The report must be submitted in Subdivision immediately after patrolling . For patrolling work all labour, skilled technician, literate staff/ supervisor duly equipped with Binocular, T&P, Vehicle etc. Is to be arranged by the contractor at his own cost, Contractor has to started the emergency patrolling as and when imitation is given by concerned SDO/JE.
Thermal scanining of all section tower of 400 KV Unnao-Agra line during peak hours to identify hot point in nut bolt of tension fitting/dead end /jumper cone of all R, Y, B, phase. The thermal scanning camera of letest version/model of reputed make shall be arranged by agency at his own cost. The work also includes submitting of hot point report of all section tower with phase within 02 days after completion of thermal scanning.
Attending breakdown of one bundle Conductor of one span of Twin Moos Conductor of 400 KV Unno-Agra line alongwith dismantling of conductor and accessories, lowering down of conductor and accessories frome tower location including clipping, cutting of damage portion of conductor jointing fresh required size of conductor one phase including fitting associated accessories for completion of work, re-rolling the conductor and carriage of meterials from site to store, all labor, skilled technician , T&P, vehical along with mobilization of gang etc, is to arranged by the contractor at his own cost. Carriage of material frome store to site and site to store is also to be part of work.
Attending breakdown of one span earthwire of size 7/3, 67mm SWG of 400 KV Unnao-Agra line alongwith dismentling of earthwire and accessories, lowering down of earthwire and accessories from tower location including clipping, cutting of damage portion of earthwire jointing fresh required earthwire of one span including fitting associated accessories for completion of work, re-rolling the earthwire and carriage of meterials from site to store, all labor, skilled technician , T&P, vehical along with mobilization of gang etc, is to arranged by the contractor at his own cost. Carriage of material frome store to site and site to store is also to be part of work.
Attending breakedown due to failure of disk insulator/polymer and replacement of Tension/Suspension string along with mobilization of skilled gang including carriage of material from site to store and store to site for completion of work.
Tension String. (160 KN Disc Insulator)
Suspension String. (120 KN Disc Insulator)
Checking and tghtening of all three phase jumpers at both end of section tower of 400 KV Unnao-Agra line including replacement of sporked nuts, bolts by climbing of tower including the cost of transportation and T&P.
Dismantling of damaged jumper of 400 KV Unnao-Agra Line. And fixing of new jumper with spacer by ACSR Moose conductor the job includes cutting & making of jumper as per condition of site.
Dismantling of damaged Birdguard of 400 KV Unnao-Agra Line. And collect damaged Birdguard,loading, carriage and unloading from site to store.[Sikandra kanpur dehat]
Globe Tech Solutions Consultancy Pvt Ltd
Katyani Construction Co.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .