Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.6 LAccepted-AOC | L1 | Accepted-AOC 1ST LOWEST | |
| 2 | L2₹63.9 L+₹31,799 (0.50%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹66.1 L+₹2.5 L (4.00%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest | |
| 4 | L4₹73.1 L+₹9.5 L (15.0%)Rejected-Finance | L4 | Rejected-Finance 4th Lowest |
| Sl No | Description | Qty | Unit | UNITED CONSTRUCTION SERVICE L1 | P MAZUMDER AND COMPANY L2 | N K BUILDERS L3 | MAHALAKSHMI (SINHA) TRADERS L4 |
|---|---|---|---|---|---|---|---|
| 1.00Supply of Pump Operator (semi-skilled) for day to day operation of pump motor set & controlling valves in water supply line as well as in headers as and when required to provide uninterrupted water supply at different buildings including minor maintenance of pump, motor, starters etc. as and when required. (Rate inclusive of Bonus, PF, ESI, tools & plants). SSKM Hospital campus= 6 Nos. Operator X 3 Shifts X 365 Days. = 6570 Nos. SNP Hospital and P.G. Polyclinic= 1 No. Operator X 3 Shifts X 365 Days. = 1095 Nos. Ramrik Das Haralalka Hospital= 1 No. Operator X 3 Shifts X 365 Days. = 1095 Nos. Kolkata Police Hospital= 1 No. Operator X 3 Shifts X 365 Days. = 1095 Nos. Total = 9855 Nos. The Estimated rate has already been given (in Cell F14 of sheet 1 of BOQ) which is calculated considering prevailing minimum wages vide memo no.06/Stat /14/RW/24/2023/LCS/JLC Dated. 09/01/2026 & 07/Stat /14/RW/24/2023/LCS/JLC Dated. 09/01/2026 of Additional Labour Commissioner, Govt. of West Bengal & also considering contribution to E.P.F.,E.S.I. & Bonus to be made by the Agency vide memo no. 3790-F(Y) Dated 21.07.2014 of Joint Secretary, Finance (Audit) Department, Govt. of West Bengal icluding 18% GST . Intending bidders are only required to quote the Service Charges in Percentage (%) rate (Higher) in Cell M14 of Sheet 1 of BOQ. | |||||||
| 1.01 | Profit / Service Charges
Total Pump Operator (semi-skilled) for all day round the clock including Service charges.
(Inclusive all taxes & duties) | 9,855 | per shift per day | 0 ₹63,59,925 Lowest | 0.01 ₹63,91,724 | 0.04 ₹66,14,321 | 0.15 ₹73,13,913 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
30 Jun 2026, 1:00 pmClosed
Executive Engineer, KSHD, PWD
KIT Building, 2nd Floor, P-16, India Exchange Place Extension, Kolkata-700073
Day to day operation of pump motor set and controlling valves to ensure the day after day water supply for better patient care service at SSKMH campus, SNPH, PG Polyclinic, Ramrik Das Haralalka Hospital and KPH_IPGMER during FY 2026-27.
2026_WBPWD_5015444_1
WBPWD/KSHD/EE/NIQ-06 OF 2026-2027
Open Tender
CIVIL WORKS
Item Rate
365 days
IPGMER-SSKM Hospital
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.3 L
Yes
1 Sept 2026
12 Jun 2026
2 Jul 2026
16 Jun 2026
30 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply of Pump Operator (semi-skilled) for day to day operation of pump motor set & controlling valves in water supply line as well as in headers as and when required to provide uninterrupted water supply at different buildings including minor maintenance of pump, motor, starters etc. as and when required. (Rate inclusive of Bonus, PF, ESI, tools & plants). SSKM Hospital campus= 6 Nos. Operator X 3 Shifts X 365 Days. = 6570 Nos. SNP Hospital and P.G. Polyclinic= 1 No. Operator X 3 Shifts X 365 Days. = 1095 Nos. Ramrik Das Haralalka Hospital= 1 No. Operator X 3 Shifts X 365 Days. = 1095 Nos. Kolkata Police Hospital= 1 No. Operator X 3 Shifts X 365 Days. = 1095 Nos. Total = 9855 Nos. The Estimated rate has already been given (in Cell F14 of sheet 1 of BOQ) which is calculated considering prevailing minimum wages vide memo no.06/Stat /14/RW/24/2023/LCS/JLC Dated. 09/01/2026 & 07/Stat /14/RW/24/2023/LCS/JLC Dated. 09/01/2026 of Additional Labour Commissioner, Govt. of West Bengal & also considering contribution to E.P.F.,E.S.I. & Bonus to be made by the Agency vide memo no. 3790-F(Y) Dated 21.07.2014 of Joint Secretary, Finance (Audit) Department, Govt. of West Bengal icluding 18% GST . Intending bidders are only required to quote the Service Charges in Percentage (%) rate (Higher) in Cell M14 of Sheet 1 of BOQ. | |||||
| 1.01 | Profit / Service Charges
Total Pump Operator (semi-skilled) for all day round the clock including Service charges.
(Inclusive all taxes & duties) | 9,855 | per shift per day | 645.35 | ₹63,59,924.25 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
2911.pdf
Tender Documents • 0.89 MB
BOQ_5084242.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .