Loading…
Loading…
Ref. No.
Tender Value
Refer Docs
EMD Value
₹31,000
Closing Date
11 Feb 2026, 11:00 amClosed
EKTA TIBREWAL
RHQ-LUCKNOW, NR-3
Waterproofing work on roof top of old control room at Agra Substation
NR3/NT/W-CIVIL/DOM/K00/26/01098
Limited
Civil - All
Works
Agra substation
₹31,000
27 Jan 2026
27 Jan 2026
13 Feb 2026
27 Jan 2026
11 Feb 2026
27 Jan 2026
Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3 mm thick water proofing membrane, black finished reinforced with non-woven polyester matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/litre and viscocity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc, and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : Joint strength in longitudinal and transverse direction at 23°C as 650/ 450N/5cm. Tear strength in longitudinal and transverse direction as 300/250N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane : 03mm thick
Preparing the surface by bridging all the cracks with Nano Fix Crack bond or equivalent that are visible on the existing top surface and repairing all the copings with polymer modified mortar followed by epoxy bonding agent cleaning & removing loose laitance etc and cleaning the surface properly and removing the debris from the site(Equivakent brands FOSROC/SIKA/BASF/NANO FIX)
Name Surmane
Title
DD-MMM-YYYY
India
Bid Security
Exempted
Dessignation:
Ref. of page, Clause & Name of Documents
Date of Retirement/ Resignation from POWERGRID
Designation:
Yes /No
Partial offloading under a Contrct and/or Facilitation beyond 10% of the Contract Price shall also be treated as Termination. For the said purpose, the Contract price means the Contract Price of the Facilities notwithstanding the Construction of the Contract
In case POWERGRID has issued a letter in this regard wherein the firm has been put on hold from award of further contract(s) for a specified period and this specified period of hold is yet to expire, the bidder shall indicate “Yes” against this event.
For the purpose of working out 50% of the Contract, following shall be taken into account suitably:
Main aspect of the QR
Manufacture & Supply
Construction of Transmission Line
Construction of bays
Manufacture & Supply
Manufacture & Supply of GIS bays
Regarding Sr. No. 6, in case of ‘Yes’, following information shall be submitted additionally:
Designation:
Designation:
Proprietorship
Designation:
Designation:
Proprietorship
Saving Account
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Annexure-I Instructions to Bidders.docx
docx • 0.07 MB
Annexure-II Conditions of Contract.docx
docx • 0.09 MB
Annexure-III Indicative BOQ.xlsx
xlsx • 0.02 MB
Annexure-III SFQP.pdf
pdf • 2.86 MB
Annexure-III Technical specifications.pdf
pdf • 0.34 MB
Appendix-I to Conditions of Contract.docx
docx • 0.03 MB
Attachment 4 (Affidavit for self-certificataion).DOCX
docx • 0.02 MB
Bid Form.xlsx
xlsx • 0.06 MB
Bid Security Format.docx
docx • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .