Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | ist₹98,800Accepted-AOC 01 AGNI AUTOMATION AND SECURITY 01 KUNDAN BHAWAN SHIVAM VIHAR COLONY OPP KIET ENGG COLLEGE MURADNAGAR GHAZIABAD 201206 U P INDIA MURADNAGAR | GHAZIABAD | UTTAR PRADESH | 201206 | ist | Accepted-AOC L1 | |
| 2 | IInd₹1.3 LRejected-AOC | IInd | Rejected-AOC L2 | |
| 3 | IIIrd₹1.4 LRejected-AOC | IIIrd | Rejected-AOC L3 |
Tender Value
₹1.6 L
EMD Value
₹2,000
Closing Date
18 Apr 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
143-ETC-I(A)/ 2021-2022
2022_UPTCL_678020_1
143-ETC-I(A)/ 2021-2022
Open Tender
Electrical Works
Item Rate
60 days
Jahanabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE,ETC,PRAYAGRAJ
₹2,000
22 Jun 2022
12 Mar 2022
19 Apr 2022
12 Mar 2022
18 Apr 2022
12 Mar 2022
120 days
Amount
Complete Dismantling of CGL-Ingersoll Rand make compressor with 145 KV SF6 circuit breaker and erection of new SF6 Circuti breaker (CGL Make) of 132 KV Hamirpur bay at 132 KV Substation Jahanabad under Electy. Trans. Division- Fatehpur.
Proper and sare dismantling of cable termination from old 145 KV circuit breaker (CGL make) of 132 KV Hamirpur bay after proper identification of ferruling with required T&P for completion of work as per drawing. Contractor will arrange all labour and T&P at his own cost.
Complete dismantling of 145 KV CGL make SF6 Circuit breaker with compressor after proper and safe dismantling of cable termination from breaker end of 132 KV Hamirpur bay at 132 KV S/S Jahanabad under ETD- Fatehpur. This job also includes cutting of earth flat from old circuit breaker, dismantling of jumpers & shifting of circuit breaker and its different parts from respective site to store room and all other associated work required to complete the job satisfactorily. Contractor will arrange all labour and T&P at his own cost.
Carriage of 145 KV CGL Make SF6 Circuit breaker from 220 KV Substation Fatehpur to 132 KV S/S Jahanabad. This job includes loading and unloading of 145 KV CB from respective substation. Contractor will arrange all labour, T&P and hydraulic crane at his own cost. (dist. approx=65Km.)
Proper and safe erection of new 145 KV CGL make circuit breaker. This job includes loading of circuit breaker from substation store and erection at respective site, proper earthing with 75x10 mm earth flat at three points and its painting with one coat red oxide and two coat green enamled paint. This job also includes proper holes and welding (if required) for satisfactorily erection of new circuit breaker. Contractor will arrange all labour, T&P at his own cost. (Earth flat will be provided by contractor).
Proper and safe cable termination of new 145 KV circuit breaker (CGL Make) of 132 KV Hamirpur bay including proper ferruling with required T&P for completion of work as per drawing. This job includes making necessary required supply and fixing of cable glands. Ferule of appropriate size and No. respectively for each core of cable and its termination with crimping type lugs and all associated work to complete the job satisfactorily. Contractor will arrange all required materials, labour and T&P at his own cost.
Proper and safe jumpering after complete erection of new 145 KV Circuit breaker (or replacement of jumpers if requried) of 132 KV Hamirpur bay at 132 KV S/S Jahanabad. Contractor will arrange all labour and T&P at his own cost.
Proper commissioning of above circuit breaker after complete installation and all associated work to complete the job satisfactorily. Contracotr will arrange all required labour and T&P at his own cost.
Complete dismantling of existing 145 KV circuit breaker (CGL Make) foundation of Hamirpur bay.
Construction of New 145 KV circuit breaker (CGL Make) foundation of Hamirpur bay.
MS RK ERACTORS
alfa engineering
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .