Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹58,807Accepted-AOC 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 1 | Accepted-AOC L1 | |
| 2 | 2₹64,290+₹5,750 (9.82%)Rejected-AOC 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
Closing Date
11 Mar 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS I Overhauling of Alum dozing Pump 2 Nos and replacement of existing damaged eroded pipe lines in lime softener house
2024_EB_430750_1
CE/MTPS-I / SE / M-I / CA / OT. 511/2023-24
Open Tender
Power/Energy Projects/Products
Works
10 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
Yes
21 Dec 2024
26 Feb 2024
12 Mar 2024
26 Feb 2024
11 Mar 2024
26 Feb 2024
Amount
Decoupling the motor and the liquid well assembly, Draining the oil from the pump, dismantling the speed reduction assembly, dismantling the plunger and the pump bodies and connected flanges.
Dismantling the crosshead piston connecting rod, plunger assembly, valve and valve seats, removing the well crank plate, removal of sleeve for cross head, removal of the bearings properly, dismantling of worm and worm wheel assemblies, cleaning and inspection of all the above parts for wear and replacement if necessary. Reassembling all the above after overhauling as per the procedure.
Inspection of couplings, coupling pads and replacing if necessary, Coupling the motor and the liquid well assembly, Filling of oil in the sump, Assembling the speed reduction assembly, connecting the plunger and the pump bodies and connected flanges, checking of alignment with the motor and successful commissioning of the pump. Cleaning & painting the complete pump assembly & Base structure, painting the connected pipelines and painting of the pump base concrete structure. with Oil Distemper inclusive of charges (Paint under Contractor Scope).
Charges for dismantling the existing eroded 1” inch G.I Pipe line in lime softener house.
Charges for dismantling the existing damaged 1” inch PVC Pipe line in lime softener house.
Charges for laying of 1” inch UPVC line which includes cutting and joining of pipes along with supports, clamps and screws required for laying the pipe.
Charges for fixing and joining of 1” inch UPVC elbow, TEE, flange, Union & valve in the 1” inch UPVC pipe as instructed by site in charge which includes solvent for joining with the pipe.
Cost of 1” UPVC pipe, Sch.80 of approved make of Ashirvad, Finolex.
Cost of 1” inch UPVC Flange with gasket, Sch.80 of approved make of Ashirvad, Finolex
Cost of SS 317 bolt of size M 10x 65 mm with double washer.
Cost of 1” inch UPVC ball Valve, Sch.80 of approved make of Ashirvad, Finolex
Cost of Connecting Rod – part No.10 for alum dosing pump(TM 34)
Cost of Consumable and Tools & Plants
SS ENGINEERING CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .