Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.6 L+₹21,804.14 (6.46%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.0 L+₹60,237.40 (17.9%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.0 L+₹62,859.42 (18.6%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹4.2 L+₹85,974.57 (25.5%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹6.9 L
EMD Value
₹13,800
Closing Date
21 Sept 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_324575_10
e-NIT No. 113 of REW Poonch 2026-27 Dated 14-09-2026
Open Tender
Civil Works
Percentage
40 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer REW Division Poonch
₹13,800
3 Oct 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Slip clerance of soil including soil or clerance | 786.84 | cum | 331.15 | ₹2,60,562.07 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | 101.25 | cum | 256.85 | ₹26,006.06 |
| 3 | Surface dressing of ground | 1,600 | sqm | 24.12 | ₹38,592 |
| 4 | Supply and stacking of stone aggregates 22.4 to 53mm | 150 | cum | 1,204.15 | ₹1,80,622.5 |
| 5 | Supply and stacking of stone screening | 18 | cum | 1,204.15 | ₹21,674.7 |
| 6 | good earth | 17.87 | cum | 281.3 | ₹5,026.83 |
| 7 | Laying spreading and compacting both agg screening | 150 | cum | 768.15 | ₹1,15,222.5 |
| 8 | carriage of stone agg 10km mt | 148 | cum | 279.04 | ₹41,297.92 |
| 9 | ADD CIB | 1 | NO | 1,000 | ₹1,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_1095194.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .