Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.6 L+₹26,015.44 (11.3%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.7 L+₹45,158.88 (19.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.8 L+₹54,976.03 (23.9%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹3.1 L+₹81,973.19 (35.7%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
16 Jul 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Const.of Tractor road from Tokli to ST Basti W.No.8 Gurha Panditan panchayat Forelain West B Block Barnoti.
2026_RDPR_314692_15
e-NIT No.80/REW/K of 2026-27 Dated 24/06/2026
Open Tender
Civil Works
Percentage
90 days
Barnoti
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹9,800
20 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
16 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil: | 680 | cum | 425 | ₹2,89,000 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth for 1 meter from cutting edge and disposal of surplus excavated earth as directed: | 40.31 | cum | 479.3 | ₹19,320.58 |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 90.62 | cum | 371.15 | ₹33,633.61 |
| 4 | Supply and dumping of stones comlete | 77.02 | cum | 937.9 | ₹72,237.06 |
| 5 | Carriage of Stones avg. lead of 1km by M.T | 77.02 | sqm | 151.47 | ₹11,666.22 |
| 6 | Add cost of wire crates zinc coated 20*4*4 | 10 | Nos. | 6,000 | ₹60,000 |
| 7 | Add cost of Sign board | 1 | nos | 5,000 | ₹5,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.54 MB
BOQ_1019100.xls
BOQ • 0.29 MB
extension80.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .