Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.6 LAdmitted-Finance | -59.01% | ₹23.6 L | L1 | Admitted-Finance |
| 2 | L2₹41.2 LAdmitted-Finance WARD NO 04 KRISHNA COLONY KATHUA | KATHUA | JAMMU AND KASHMIR | 184101 | -28.53% | ₹41.2 L | L2 | Admitted-Finance |
| 3 | L3₹44.9 LAdmitted-Finance | -22.01% | ₹44.9 L | L3 | Admitted-Finance |
| 4 | L4₹46.0 LAdmitted-Finance | -20.21% | ₹46.0 L | L4 | Admitted-Finance |
| 5 | L5₹55.3 LAdmitted-Finance | -4.00% | ₹55.3 L | L5 | Admitted-Finance |
Tender Value
₹57.6 L
EMD Value
₹1.7 L
Closing Date
21 Apr 2026, 4:00 pmClosed
EXECUTIVE ENGINEER PMGSY DIVISION KATHUA
PMGSY DIVISION KATHUA
Constt. Of road L022 Jakhole to Raichengera JK07-256 under Permanent Restoration
2026_JKRRD_147272_1
EEPMGSYKUA07OF2026 27 11.04.2026
Open Tender
CIVIL
90 days
Constt. Of road JakConstt. Of road Jakhole to Raic
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
EXECUTIVE ENGINEER PMGSY DIVISION KATHUA
₹1.7 L
Yes
PMGSY DIVISION KATHUA
6 May 2026
15 Apr 2026
22 Apr 2026
15 Apr 2026
21 Apr 2026
15 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kind of Soil 60%, Ordinary rock 20%, Hard rock 20% ( Blasting Probhited) Complete Job | - | Cum | - | - | BI01010001010000000000000515BI0100001119 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed , all kind of Soil 70%, Ornidary Rock 20% Hard Rock 10%. | - | Cum | - | - | BI01010001010000000000000515BI0100001120 |
| 3 | Hand-packing stones in wire-crates; including cost of crates and stones. | - | Cum | - | - | BI01010001010000000000000515BI0100001121 |
| 4 | Dumping stone including cost of stones in Horizontal on level (Back Filling) | 302.92 | cum | 937.9 | ₹2,84,108.67 | BI01010001010000000000000515BI0100001122 |
| 5 | River bed material (RBM) behind R/Wall omplete job. | 585.87 | CUM | 350 | ₹2,05,054.5 | BI01010001010000000000000515BI0100001123 |
| 6 | Slip Clearance in soil mixed with moorum/ Kankar/ shingle/ boulder disposal lead upto 50mtr and lift upto 1.50mtr | 288.78 | Cum | 331.15 | ₹95,629.5 | BI01010001010000000000000515BI0100001124 |
| 7 | Carriage of materials by M.T. from source to site of work incl. loading/unloading complete.a) Carriage of stone as per carriage chart Avg. Distance 10km by MT | 2,581.6 | Cum | 328.31 | ₹8,47,565.1 | BI01010001010000000000000515BI0100001125 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_229465.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid