Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹61.3 LAccepted-Finance | ₹61.3 L | L2 | Accepted-Finance ULB committee decide |
| 2 | L1₹61.3 LRejected-Finance NAYAN JYOTI TALUKDAR SORBHOG PO SORBHOG PS SORBHOG DISTRICT BARPETA PIN 781317 | BARPETA | ASSAM | 781317 | ₹61.3 L | L1 | Rejected-Finance ULB committee decide. L1 but above 10 percent less not accepted. |
| 3 | L2₹61.3 LRejected-Finance | ₹61.3 L | L2 | Rejected-Finance ULB committee decide. |
| Sl No | Description | Qty | Unit | Debadib Das L2 | Nayanjyoti Talukdar L1 | M/s Shivam Consortium L2 |
|---|---|---|---|---|---|---|
| 1.01 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Ordinary Soil
A) Manual Means (Depth upto 3 m)( Without dewatering ) | 460.2 | Cum | 162.25 ₹74,667.45 | 250 ₹1.2 L | 162.25 ₹74,667.45 |
| 1.02 | Providing and laying of dry rubble flooring complete as per drawings and
technical specifications Clause 1303.3 | 43.2 | Cum | 8,499.84 ₹3.7 L | 500 ₹21,600 | 8,499.84 ₹3.7 L |
| 1.03 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
A) With crushed Stone
ii) PCC Grade M15 | 43.2 | Cum | 8,000 ₹3.5 L | 5,500 ₹2.4 L | 8,000 ₹3.5 L |
| 1.04 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
A) With Crushed Stone
iv) RCC Grade M20 | 431.04 | Cum | 9,500 ₹40.9 L | 7,000 ₹30.2 L | 9,500 ₹40.9 L |
| 1.05 | Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From
Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 16 mm Dia Bar | 25.06 | MT | 8,000.3 ₹2.0 L | 90,000 ₹22.6 L | 8,000.3 ₹2.0 L |
| 1.06 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 | 120 | Nos | 2,600 ₹3.1 L | 247 ₹29,640 | 2,600 ₹3.1 L |
| 1.07 | Backfilling behind abutment, wing wall and return wall complete as per
drawings & technical specification Clause 1204.3.8
B)Sandy material | 532.8 | Cum | 700 ₹3.7 L | 500 ₹2.7 L | 700 ₹3.7 L |
| 1.08 | Brick masonry work in 1:3 in sub-structure complete excluding pointing
and plastering, as per drawing and technical specifications | 24 | Cum | 8,000.01 ₹1.9 L | 5,500 ₹1.3 L | 8,000.01 ₹1.9 L |
| 1.09 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as
per Technical specifications | 192 | Sqm | 450 ₹86,400 | 150 ₹28,800 | 450 ₹86,400 |
| 1.10 | Pointing with cement mortar (1:3 ) on brick work in substructure as per
Technical specifications | 192 | Sqm | 450 ₹86,400 | 150 ₹28,800 | 450 ₹86,400 |
Tender Value
₹68.1 L
EMD Value
₹1.4 L
Closing Date
21 Jan 2026, 12:00 pmClosed
Chairman Barpeta Municipal Board Barpeta
Chairman
Construction of RCC Retaining Wall and Brick Boundary wall on West and North side of Proposed Sewage Treatment Plant
2025_UDD_49730_1
NIT NO 16-2025-26
Open Tender
Civil Works
BMB
Please refer Tender documents.
2 documents required · 2 mandatory
₹40
Yes
₹1.4 L
Yes
21 Apr 2026
30 Dec 2025
21 Jan 2026
30 Dec 2025
21 Jan 2026
30 Dec 2025
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary Soil A) Manual Means (Depth upto 3 m)( Without dewatering )
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 A) With crushed Stone ii) PCC Grade M15
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 A) With Crushed Stone iv) RCC Grade M20
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 16 mm Dia Bar
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 B)Sandy material
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and technical specifications
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical specifications
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_79067.pdf
techsummary_79067.pdf
finance_79067.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
SBD.pdf
Tender Documents • 2.06 MB
BOQ_79067.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid