| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 CrRejected-Finance GRAM KAKNA POST JAITPUR SAHJANWAN DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹1.1 Cr | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S ARPNA CONSTRUCTION L2 | S.B. ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick jungle and thorney bushes without uprooting including cost of all labour and T&P etc. required for proper completion of work. As per direction of Engineer -in -charge. | 52,026.5 | Sqm | 5.9 ₹3,06,956.35 | 5 ₹2,60,132.5 Lowest |
| 2.00 | Earth work in excavation of foundation including all lead & lift, labour and T&P etc with manual compaction and dressing to profile. As per direction of Engineer -in -charge. | 508.99 | Cum | 121 ₹61,587.79 | 90 ₹45,809.1 Lowest |
| 3.00 | Construction of sub grade by earthen shoulders with all lead & lift including Mechanical compaction and all cost of labour, T&P etc. Required for Proper completion of work | 7,270.8 | Cum | 121 ₹8,79,766.8 Lowest | 140 ₹10,17,912 |
| 4.00 | Earth work in making Daula with manual compaction dressing by any means lead upto 30 m & lift upto 1.50m. As per direction of Engineer -in -charge. | 4,419.5 | Cum | 121 ₹5,34,759.5 | 90 ₹3,97,755 Lowest |
| 5.00 | Providing & filling of local sand including all lead & lift with machinical compaction, labour T & P etc. | 1,003.5 | Cum | 500 ₹5,01,750 | 350 ₹3,51,225 Lowest |
| 6.00 | Dry earth filling including manual compaction dressing all lead & lift in trench of outlet. including all lead upto & lift, labour and T&P etc As per direction of Engineer -in -charge. | 264 | Cum | 100 ₹26,400 | 90 ₹23,760 Lowest |
| 7.00 | Providing & Laying P.C.C 1:3:6 in foundation of wall with cement, coarse sand and 10-20 mm size stone ballast including cost of all material, labour and T&P etc. required for proper completion of work. | 21.51 | Cum | 8,000 ₹1,72,080 Lowest | 8,000 ₹1,72,080 Lowest |
| 8.00 | Providing & Laying M-150 1st Class Brick work in 1:4 cement mortar including all cost of material ,labour T&P etc,required for completion of work. As per direction of Engineer -in -charge. | 80.1 | Cum | 6,000 ₹4,80,600 Lowest | 6,000 ₹4,80,600 Lowest |
| 9.00 | Dismantalling brick work in lime or cement mortar including stacking of materials with all lead & lift etc. as directed by engineer-in- charge . | 3.92 | Cum | 500 ₹1,960 | 490 ₹1,920.8 Lowest |
| 10.00 | Centering & shuttering for RCC work other than building including all cost of material & labour and T&P etc.For bridge slabs above 3.0 meter span Required for completion of work . As per direction of Engineer -in -charge. | 116.88 | Sqm | 700 ₹81,816 Lowest | 770 ₹89,997.6 |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
23 May 2026, 10:00 amClosed
Superintending Engineer
Office of Superintending Engineer, VII Circle Irrigation Works, Sarojni Naidu Marg, Lucknow.
AS PER TENDER NOTICE-02 LOT-04
2026_UPIDC_1149249_4
02/SE-VII/2026-27
Open Tender
Civil Works - Canal
Item Rate
270 days
Barabanki
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,213
₹2.4 L
Lucknow
20 Jul 2026
18 May 2026
23 May 2026
18 May 2026
23 May 2026
18 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick jungle and thorney bushes without uprooting including cost of all labour and T&P etc. required for proper completion of work. As per direction of Engineer -in -charge. | 52,026.5 | Sqm | - | - |
| 2 | Earth work in excavation of foundation including all lead & lift, labour and T&P etc with manual compaction and dressing to profile. As per direction of Engineer -in -charge. | 508.99 | Cum | - | - |
| 3 | Construction of sub grade by earthen shoulders with all lead & lift including Mechanical compaction and all cost of labour, T&P etc. Required for Proper completion of work | 7,270.8 | Cum | - | - |
| 4 | Earth work in making Daula with manual compaction dressing by any means lead upto 30 m & lift upto 1.50m. As per direction of Engineer -in -charge. | 4,419.5 | Cum | - | - |
| 5 | Providing & filling of local sand including all lead & lift with machinical compaction, labour T & P etc. | 1,003.5 | Cum | - | - |
| 6 | Dry earth filling including manual compaction dressing all lead & lift in trench of outlet. including all lead upto & lift, labour and T&P etc As per direction of Engineer -in -charge. | 264 | Cum | - | - |
| 7 | Providing & Laying P.C.C 1:3:6 in foundation of wall with cement, coarse sand and 10-20 mm size stone ballast including cost of all material, labour and T&P etc. required for proper completion of work. | 21.51 | Cum | - | - |
| 8 | Providing & Laying M-150 1st Class Brick work in 1:4 cement mortar including all cost of material ,labour T&P etc,required for completion of work. As per direction of Engineer -in -charge. | 80.1 | Cum | - | - |
| 9 | Dismantalling brick work in lime or cement mortar including stacking of materials with all lead & lift etc. as directed by engineer-in- charge . | 3.92 | Cum | - | - |
| 10 | Centering & shuttering for RCC work other than building including all cost of material & labour and T&P etc.For bridge slabs above 3.0 meter span Required for completion of work . As per direction of Engineer -in -charge. | 116.88 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BID02LOT04.pdf
Tender Documents • 2.10 MB
BOQ_2151639.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].