Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-adjoining |
Tender Value
₹2.9 L
Closing Date
19 Oct 2021, 6:55 pmClosed
Office Of the Executive Engineer, REW Poonch
Office Of the Executive Engineer, REW Poonch
please refer to BOQ
2021_RDPR_141670_1
e-NIT No. 125 of REW POONCH, Dated 28-09-2021
Open Tender
Civil Works
Item Rate
30 days
Poonch
Please refer to Technical Bid
2 documents required · 2 mandatory
₹600
Executive Engineer, REW Poonch
Exempted
6 Nov 2021
28 Sept 2021
20 Oct 2021
28 Sept 2021
19 Oct 2021
28 Sept 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of (a) all kind of soil 80% ordinary rock 20%
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (a) 80% cement conc (b) 20% stone (plum), excluding carriage
Centering and shuttering including strutting, propping etc. and removal of form for: a Foundations, footings, bases of columns etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, pillars, piers, abutments, posts and struts
Centering and shuttering including strutting, propping etc. Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form work forEdges of slabs and breaks in floors and walls
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete, TMT Bars
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size), with 30% Stone (Plum), excluding carriage
Carriage of sand bajri 7km by MT 800m By H/L
Carriage of cement tar steel 7km by MT 300 m by HL
Carriage of stone 300 by HL
Installation / Construction of Sign Board (C.I.B) Showing details of project of required specifications, as directed by Engineer Incharge at Site.
Mohd Mashooq
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .