Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 137 1 5 NISSEN HUT NH 5 N I T FARIDABAD 121001 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121001 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹72 L
EMD Value
₹1.4 L
Closing Date
15 Mar 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager
Zirconium Complex, Pazhayakayal, Tuticorin.
Painting of structural members, Pipelines, EOT cranes and furnaces in SPF, Zirconium Complex, Pazhayakayal - Tuticorin-628152
2023_NFC_742062_1
ZC/NFC/ SPF/2022/06
Open Tender
Paint / Enamel Works
Item Rate
730 days
SPF, Zirconium Complex, Pazhayakayal
Please refer tender document
7 documents required · 7 mandatory
₹0
₹1.4 L
Yes
16 Mar 2023
23 Feb 2023
16 Mar 2023
23 Feb 2023
15 Mar 2023
27 Feb 2023
Amount
Painting of structural members, pipelines and furnaces in Sponge production facility. The work includes Surface preparation and applying one coat of primer, two coats of chloro-rubber paint on structures, pipelines, EOT cranes and chequered plates with DFT not less than 90micron and one coat of primer, two coats of heat resistance paint(up to 250 deg.C) on furnace surface with DFT not less than 90micron. The scope of work includes the supply of chloro-rubber paint, heat resistant paint, primer, thinner, cleaning materials, tools, tackles and manpower for completing the job as required and directed by the Engineer in- charge. Note: 1) Paint/Primer/Thinner make must be Asian/Berger 2) Scope of work includes minimum supply of Chloro-rubber paint-4500Liters, Heat resistant paint with resistant upto 250°C -630 Liters, Primer-2600Liters and required thinner for above quantities. 3) The quantity mentioned above for supply should made register in gate entry and cleared by EIC before start of work. 4) Vendors are advised to visit the site for accessing the work before quoting. 5) The rate shall include cost of material, consumable, transportation, labour, and other expenditure involved for finished item
Erection & de-erection of scaffolding at various locations of Sponge production facility, Zirconium Complex as per engineer in charge direction for painting work with supply of required scaffolding pipes, clamps, safety platform grills etc as per IS:4014(Part 1&2)-1967 and directed by the Engineer in- charge. Note: 1) The rate shall include cost of material, consumable, labour, and other expenditure involved for finished item
PEARL ENTERPRISES
Ramesh Enterprises
Rali Engineering Works
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .