| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 CrAccepted-Finance | ₹15.0 Cr | L1 | Accepted-Finance due to L1 |
| 2 | L2₹15.0 Cr+₹5,464.20 (<0.01%)Rejected-Finance | ₹15.0 Cr+₹5,464.20 (<0.01%) | L2 | Rejected-Finance due to L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Found Non-Responsive as per SBD |
| 4 | Rejected-Technical | - | - | Rejected-Technical Found Non-Responsive as per SBD |
| Sl No | Description | Qty | Unit | Ms DRENGO CONSTRUCTION L2 | Ms BT Construction Co L1 |
|---|---|---|---|---|---|
| 1.00SH : 1 : Foundation | |||||
| 1.01 | Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material .. Mechanical means,Ordinary Soil. | 2,350 | Cum | 115.64 ₹2,71,754 | 115.63 ₹2,71,730.5 Lowest |
| 1.02 | Bored cast-in-situ M35 grade R C C Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earthwith all lifts and lead upto 1000 m. Pile diameter - 1200 mm. P C C M35 | 192 | m | 21,284.63 ₹40,86,648.96 | 21,283.78 ₹40,86,485.76 Lowest |
| 1.03 | Pile Integrity Test.
(Pile Integrity test using Low Strain Integrity testing method as per provision of IRC-78-2014, Appendix - 7,Part-2 and IS:14893 as per direction of Engineer -In-Charge including Chipping and Levelling of concrete for testing. Both Banks | 16 | Nos | 22,278.18 ₹3,56,450.88 | 22,277.29 ₹3,56,436.64 Lowest |
| 1.04 | Providing Steel liner 10 mm thick for piles including fabricating and steining out as per detailed drawing. (Using 10mm thick steel plain sheets of steel grade E250) | 57.73 | MT | 1,23,060.97 ₹71,04,309.8 | 1,23,056.05 ₹71,04,025.77 Lowest |
| 1.05 | Proving and laying of PCC of grade M15 levelling course of 100mm thick below the bottom level of pile cap. | 17.02 | Cum | 9,382.09 ₹1,59,683.17 | 9,381.71 ₹1,59,676.7 Lowest |
| 1.06 | Providing and casting Cement Concrete for Reinforced Concrete of grade M35 in Pile Cap complete as per Drawing and Technical Specification. | 285.12 | Cum | 12,302.56 ₹35,07,705.91 | 12,302.06 ₹35,07,563.35 Lowest |
| 1.07 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per Drawing and Technical Specifications | 54.14 | MT | 1,04,074.96 ₹56,34,618.33 | 1,04,070.8 ₹56,34,393.11 Lowest |
| 2.00SH : 2 : Sub structure | |||||
| 2.01 | Providing and casting Reinforced Cement Concrete of grade M30 in Sub structure complete as per drawing Technical Specifications. | 200.78 | Cum | 12,854.79 ₹25,80,984.74 | 12,854.28 ₹25,80,882.34 Lowest |
Tender Value
₹15.0 Cr
EMD Value
₹30.1 L
Closing Date
24 Jun 2026, 4:00 pmClosed
DPIU-II, RWD, ANINI
Office of the DPIU-II, Rural Works Department, Anini, Dibang, Valley District, Arunachal Pradesh
Construction of Bridge across DRI River on Road from BRO Road to Ahungo in Anini-Mipi Block of Dibang Valley District (A.P) under VVP (Span-80.00m).
2026_CEAR_148223_1
AR0202913A
Open Tender
Civil - Roads and Bridges
Item Rate
730 days
Bridge across DRI River on BRO Road to Ahungo
As per SBD
10 documents required · 10 mandatory
₹15,000
ARRDA, Itanagar
₹30.1 L
ANINI
22 Jul 2026
10 Jun 2026
25 Jun 2026
10 Jun 2026
24 Jun 2026
10 Jun 2026
10 Jun 2026 - 24 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH : 1 : Foundation | |||||
| 1.01 | Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material .. Mechanical means,Ordinary Soil. | 2,350 | Cum | 100 | ₹2,35,000 |
| 1.02 | Bored cast-in-situ M35 grade R C C Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earthwith all lifts and lead upto 1000 m. Pile diameter - 1200 mm. P C C M35 | 192 | m | 100 | ₹19,200 |
| 1.03 | Pile Integrity Test.
(Pile Integrity test using Low Strain Integrity testing method as per provision of IRC-78-2014, Appendix - 7,Part-2 and IS:14893 as per direction of Engineer -In-Charge including Chipping and Levelling of concrete for testing. Both Banks | 16 | Nos | 100 | ₹1,600 |
| 1.04 | Providing Steel liner 10 mm thick for piles including fabricating and steining out as per detailed drawing. (Using 10mm thick steel plain sheets of steel grade E250) | 57.73 | MT | 100 | ₹5,773 |
| 1.05 | Proving and laying of PCC of grade M15 levelling course of 100mm thick below the bottom level of pile cap. | 17.02 | Cum | 100 | ₹1,702 |
| 1.06 | Providing and casting Cement Concrete for Reinforced Concrete of grade M35 in Pile Cap complete as per Drawing and Technical Specification. | 285.12 | Cum | 100 | ₹28,512 |
| 1.07 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per Drawing and Technical Specifications | 54.14 | MT | 100 | ₹5,414 |
| 2SH : 2 : Sub structure | |||||
| 2.01 | Providing and casting Reinforced Cement Concrete of grade M30 in Sub structure complete as per drawing Technical Specifications. | 200.78 | Cum | 100 | ₹20,078 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tendernotice_2.pdf
PDF • 0.47 MB
Tendernotice_3.pdf
PDF • 0.56 MB
SBD.pdf
Tender Documents • 2.01 MB
BOQ_232002.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .