Tender Value
₹7.5 L
EMD Value
₹7,500
Closing Date
18 Mar 2023, 1:00 pmClosed
SE EDC MAHOBA
BAJARIYA MAHOBA
Increesing capacity of transformer under business plan(2023-24) work at EDC MAHOBA
2023_DVVNL_782671_1
55/SE/EDCM/2022-23
Open Tender
Electrical Works
Item Rate
180 days
Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
www.dvvnl.org
₹7,500
31 Mar 2023
7 Mar 2023
18 Mar 2023
7 Mar 2023
18 Mar 2023
7 Mar 2023
Amount
Cartage of PCC Pole from store center from any other place to the respective site of work though the kachcha pakka road including the work of dragging ete. And also including the of labour, T&P Carrier etc. required for proper completion of work.
8.5 Single Support PCC Pole
Cartage of line material Viz. Weasal conductor. G.I. earth wire, cross arm, angle, channel, insulators, clamps,A.B.CABLE 3cx120+1x95+1x70 sqmm and other line material from store center form any other place to the respective site of work through the kachcha pakka road including the work of its Loading & unloading at the respective ends, including the work dragging etc. and also including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of Grouting pole including complete. L.T/100 KVA TF Double Pole Fitting as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
8.5 Single Support PCC Pole
Erection and Grouting of stay set including the work of nozelling etc. as per RESPO manual and also including the cost grouting material, labour, T&P etc required for proper completion of work.
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc required for proper completion of work.
Cartage of following Transformer from store center or from any other place to the respective site of work through the kachcha pakka road including the work of its loading & unloading at the respective ends, includintg the work of dragging etc. and also including the cost of labour, T&P and carrier etc. required for proper completion of work.
100 KVA Transfromer
250 KVA Transfromer
400 KVA Transfromer
Erection of following Transformer on the Pole Structure in proper alignment and as per instruction of superving engineer RESPO manual it includes the cost of labour, T&P carrier etc. required proper completion of work.
100 KVA Transfromer
250 KVA Transfromer
400 KVA Transfromer
Dismounting and safe Cartage of Following Capacity Transformer form site to ESC Through the Kachcha Pakkca road including the work loading and Unloading at the respective Site including the work of dragging etc. also including the cost of labour, T&P and Carrier etc. required for proper completion of work.
100 KVA Transfromer
250 KVA Transfromer
Laying sagging stringing and binding and jumpering etc of ACSR Weasal conductor on the erected pole as per RESPO Manual and as per direction of supervising engineer. It includes the cost of labour T&P carreer etc required for proper completion of work.
ACSR Weasal Conductor
A.B.CABLE 3cx120+1x95+1x70 sqmm
L.T PVC CABLE 3.5x150 sqmm
Fancing 250 & 400 KVA T/F
Construction of plinth
CONCREATING OF POLE
M/s AVS Industries
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .