Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹9.2 L+₹88,310.50 (10.7%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹10.3 L+₹2.1 L (24.8%)Admitted-Fee/PreQual/Technical/Finance SMVDU | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹13.4 L
EMD Value
₹26,800
Closing Date
21 Jul 2026, 6:00 pmClosed
Executive Engineer PWD (RandB) Division Ramnagar.
Executive Engineer PWD (RandB) Division Ramnagar.
PLEASE REFER TO BOQ
2026_PWDJK_316365_1
e-NIT No. 30 of 2026-27 Dated 16-07-2026
Open Tender
Civil Works
Percentage
60 days
RAMNAGAR
PLEASE REFER TO NIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD (RandB) Division Ramnagar.
₹26,800
29 Jul 2026
16 Jul 2026
22 Jul 2026
16 Jul 2026
21 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material
and disposal of unserviceable material.
2.27.1 Beyond 30 cm girth upto and including 60 cm girth. | 10 | EACH | 379.05 | ₹3,790.5 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:
15.2.1 1:3:6 or richer mix (i/c equivalent design mix) | 0.65 | Cum | 1,725.2 | ₹1,121.38 |
| 3 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. | 50 | KG | 4.3 | ₹215 |
| 4 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge.
16.25.1 Made of G.I. wire of dia 4 mm | 120 | SQM | 809.9 | ₹97,188 |
| 5 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.
10.16.1 Hot finished welded type tubes | 3,873.07 | kg | 156.95 | ₹6,07,878.34 |
| 6 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 492 | kg | 181.6 | ₹89,347.2 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.11 | Cum | 5,202.9 | ₹572.32 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement-All work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) | 0.54 | Cum | 7,788.4 | ₹4,205.74 |
| 9 | Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in foundation and plinth in Cement mortar 1 :6 ( 1 cement : 6 coarse sand) & Extra for brick work in superstructure above plinth level upto floor V level. (By manual means) | 1.27 | Cum | 9,027.2 | ₹11,464.54 |
| 10 | Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) and Extra for half Brick masonry in superstructure above plinth level upto floor V level. | 120 | sqm | 1,106.9 | ₹1,32,828 |
stage.html
html • 0.02 MB
finance_1031192.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_1031192.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .