| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC WARD NO 2 KAILASH NAGAR PALWAL | PALWAL | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 Cr+₹13.5 L (5.95%)Rejected-AOC | ₹2.4 Cr+₹13.5 L (5.95%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.6 Cr+₹31.2 L (13.8%)Rejected-AOC PLOT NO F AND G RAKBA DARAKHERA PROFESSOR COLONY NAGAR PARISAD THANESAR KURUKSHETRA HARYANA 136 118 | ₹2.6 Cr+₹31.2 L (13.8%) | L3 | Rejected-AOC L3 |
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
13 Feb 2026, 5:00 pmClosed
Sandeep Dahiya
Horticulture Faridabad
HEW 153 Development of Parks, Open Spaces, and Green Belt of Sector 75, Faridabad and all other works contingent thereto including 03 years Mtc. as defect liability period free of cost for civil work, open gym and Children Playing Equipments.
2026_HBC_500186_1
2026B0C9FDD0 F507 41FC AECC 02D76DBFF91F264HSV
Open Tender
Civil Works
Works
365 days
Faridabad (MC)
as per dnit
2 documents required · 2 mandatory
₹3,000
₹5.4 L
Yes
29 Apr 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
3 Feb 2026 - 5 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 10.100.2-Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth.
HSR Rate(Rs.) 1863.00 Through Rate | - | cum | 1,863 | - |
| 2 | HSR Item 26.13.4-Digging holes in all kinds of soil, and refilling the same, with the excavated earth, mixed with well decayed farmyard manure (cost of well decayed farm yard manure to be paid separately) 4. Hole 0.60 metre dia and
0.60 metre deep
HSR Rate(Rs.) 11.00 Through Rate | - | Per Hole | 11 | - |
| 3 | HSR Item 6.1.2-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
HSR Rate(Rs.) 3476.00 Through Rate | 0.2 | cum | 3,476 | ₹695.2 |
| 4 | HSR Item 10.1-Providing and laying of base course of floors consisting of 100 mm thick cement 1:8:16 and 100 mm sand or stone filling.
HSR Rate(Rs.) 260.00 Through Rate | 1 | Sqm | 260 | ₹259.74 |
| 5 | HSR Item 10.57-Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement
: 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete.
HSR Rate(Rs.) 535.00 Through Rate | 1 | Sqm | 535 | ₹534.47 |
| 6 | HSR Item 3.1.2-By Mechanical Transport including loading, unloading and stacking 2. Earth
HSR Rate(Rs.) 5.00 Beyond 10km up to 20km per KM
Applied Note:
1.4 All distances shall be measured over the shortest practical route and not necessarily the route actually taken. Route other than shortest practical route may be considered in cases of unavoidable circumstances and as approved by Engineer-in-Charge. | 1 | cum | 163 | ₹162.84 |
| 7 | HSR Item 7.20.2-Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand)
HSR Rate(Rs.) 4146.00 Through Rate | 0.2 | cum | 4,146 | ₹825.05 |
| 8 | HSR Item 6.8.3-Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) 3. 25 mm thick HSR Rate(Rs.) 80.00 Through Rate | 0.6 | Sqm | 80 | ₹48 |
| 9 | HSR Item 13.29.2-Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
HSR Rate(Rs.) 83.00 Through Rate | 1 | Kg. | 83 | ₹82.92 |
| 10 | HSR Item 7.27.2-Half brick masonry with common burnt clay non-modular bricks of class designation 10.5 in foundations and plinth in : 2. cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 458.00 Through Rate | 0.8 | Sqm | 458 | ₹366.4 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_578790.xls
BOQ • 0.45 MB
7F80ACZ149325.pdf
Additional Documents • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .