Tender Value
₹50 L
EMD Value
₹4.5 L
Closing Date
23 Sept 2026, 12:00 pmDue tomorrow
SE, JAUNPUR-GHAZIPUR CIRCLE PWD , JAUNPUR
SE, JAUNPUR-GHAZIPUR CIRCLE PWD , JAUNPUR
Construction and Maintanance of Sidhwan Pasi Basti Link Road in Distt. Jaunpur (including 05 years maintenance)
2026_CEUVZ_1184201_6
4437/SETender/jnp-gzp circle/26 Date-25-08-2026
Open Tender
Civil Works
Percentage
180 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.5 L
Yes
SE, JAUNPUR-GHAZIPUR CIRCLE PWD , JAUNPUR
10 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from
Borrow Pits / Construction of embankment with approved
material obtained from borrow pits with a lift upto 1.5 m,
transporting to site, spreading, grading to required slope and
compacting to meet requirement of Tables 300.1 and 300.2
with a lead upto 1000 m as per Technical Specification
Clause 301.5 Including All material T&P, Labour cess etc But Excluding cost of GST | 3,034 | Cum | 73.5 | ₹2,22,999 |
| 2 | Granular Sub-base with Well Graded Material (Table 400.1) /
(A) By Mix in Place Method / Construction of granular subbase by providing well graded material, spreading in uniform
layers with motor grader on prepared surface, mixing by mix
in place method with rotavator at OMC, and compacting with
smooth wheel roller to achieve the desired density, complete
as per Technical Specification Clause 401. / (i) For Grading I
Material. Including All material T&P, Labour cess etc But Excluding cost of GST | 150.03 | Cum | 2,134.5 | ₹3,20,239.04 |
| 3 | Water Bound Macadam Sub-base/base / (3) WBM Grading 3
/ Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80-100 kN in stages
to proper grade and camber, applying and brooming, stone
screening to fill-up the interstices of coarse aggregate,
watering and compacting to the required density Grading 3 as
per Technical Specification Clause 405. / (B) By Mechanical
Means. Including All material T&P, Labour cess etc But Excluding cost of GST | 236.25 | Cum | 2,761 | ₹6,52,286.25 |
| 4 | Cement Concrete Pavement - Construction of un-reinforced,
dowel jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other type
as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS:383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a concrete mixer of
not less than 0.2 cum capacity and appropriate weigh batcher
using approved mix design, laid in approved fixed side
formwork (steel channel, laying and fixing of 125 micron thick
polythene film, wedges, steel plates including levelling the
formwork as per drawing), spreading the concrete with
shovels, rakes, compacted using needle, screed and plate
vibrators and finished in continuous operation including
provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, near
approaches to bridge/culvert and construction joints,
admixtures as approved, curing of concrete slabs for 14-days,
using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification
Clause 1501.
.Including All material T&P, Labour cess etc But Excluding cost of GST | 472.5 | Cum | 7,920 | ₹37,42,200 |
| 10 | Construction of Subgrade and Earthen Shoulders -
Construction of subgrade and earthen shoulders with
approved material obtained from borrow pits with all lifts and
leads, transporting to site, spreading, grading to required
slope and compacted to meet requirement of Table 300.2 with
lead upto 1000 m as per Technical Specification Clause
303.1. Including All material T&P, Labour cess etc But Excluding cost of GST | 917.56 | Cum | 62.8 | ₹57,622.77 |
| 11 | PART A
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 | 1.05 | Km | - | - |
| 11.1 | 1st year- maintainance cost 0% on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1.05 | Km | - | - |
| 11.2 | 2nd year- maintainance cost 0.25% on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1.05 | Km | - | - |
| 11.3 | 3rd year- maintainance cost 0.50 % on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1.05 | Km | - | - |
| 11.4 | 4th year- maintainance cost 0.75% on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1.05 | Km | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
Tendernotice_2.pdf
PDF • 14.77 MB
BOQ_2227677.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .