Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹1.7 L Quoted ₹1.5 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹1.5 L+₹2,503.11 (1.64%)Rejected-AOC NEAR GOVT GIRLS SCHOOL VILLAGE DINOD TEHSIL AND DISTRICT BHIWANI 127111 | BHIWANI | BHIWANI | HARYANA | 127111 | ₹1.5 L+₹2,503.11 (1.64%) | L2 | Rejected-AOC 2nd |
| 3 | L3₹1.8 L+₹22,916.98 (15.1%)Rejected-AOC DIV AMBALA CITY OFFICE DIV AMBALA | ₹1.8 L+₹22,916.98 (15.1%) | L3 | Rejected-AOC 3rd |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
26 Aug 2026, 3:00 pmClosed
Kailash Chander Kala Vivek and ravi kumar
DIV Ambala
AMtc of EPHS in Sector 5 UE Kurukshetra Providing and Laying of damaged sewer line Near HNo 1596 Sector 5 UE Kurukshetra complete in all respect and all other works contingent thereto
2026_HBC_541806_1
202666D3ED99 4089 4E9B 8D8A 96087346D416239HSV
Open Tender
Civil Works
Works
30 days
Kurukshetra
2 documents required · 2 mandatory
₹250
₹3,380
Yes
17 Sept 2026
18 Aug 2026
27 Aug 2026
18 Aug 2026
26 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand) | - | Sqm | 147 | - |
| 2 | [11.52]Cement rendering on plaster 1 mm thick | - | Sqm | 28 | - |
| 3 | [21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge | - | Each | 298 | - |
| 4 | [21.43]Extra over the rate laid down in this schedule for cement concrete work more making and finishing benching and complicated floor work in manholes, including formation of channels and bulldozing and smooth finishing the surface accurately to template. | - | Per sqm benching and flooring surface measures horizontaly | 160 | - |
| 5 | [21.57.1.4]Providing masonry plugs to ends of sewers of all types with 11.43 cm thick brick wall in cement sand mortar 1:7 with 12 mm thick cement plaster 1:6 (as required by the engineer-in-charge). 1.4. For Circular sewers having internal diameter - 200 mm | - | Each | 18 | - |
| 6 | [21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening | - | Each | 1,058 | - |
| 7 | [21.96.16]Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-80 grade and PN- 4 for sewer application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment. 16. Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-80 grade and PN- 4 for sewer application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment.
140 mm Outside Dia | - | Rmt. | 508 | - |
| 8 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. | 1 | cum | 83 | ₹82.92 |
| 9 | [4.31.1]Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. 1. All kinds of soil | - | cum | 51 | - |
| 10 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | - | cum | 3,476 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_621249.xls
BOQ • 0.33 MB
corringendum25082026.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .