Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Fee/PreQual/Technical/Finance | -32.00% | ₹6.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.2 L+₹58,059.45 (8.82%)Admitted-Fee/PreQual/Technical/Finance | -26.00% | ₹7.2 L+₹58,059.45 (8.82%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.4 L+₹83,702.37 (12.7%)Admitted-Fee/PreQual/Technical/Finance | -23.35% | ₹7.4 L+₹83,702.37 (12.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.5 L+₹94,636.90 (14.4%)Admitted-Fee/PreQual/Technical/Finance | -22.22% | ₹7.5 L+₹94,636.90 (14.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹8.1 L+₹1.5 L (23.5%)Admitted-Fee/PreQual/Technical/Finance | -16.00% | ₹8.1 L+₹1.5 L (23.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.7 L
EMD Value
₹19,500
Closing Date
25 Aug 2026, 2:00 pmClosed
Executive Engineer IFCD Handwara
Executive Engineer IFCD Handwara
Grat Khul Construction of Headworks and resectioning of the Canal from Rd 0 m to RD 1824 m
2026_IFC_320328_4
09-IFCD/HND/2026-27
Open Tender
Civil Works
Percentage
30 days
Executive Engineer IFCD Handwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Chief Engineer Kashmir Irrigation and FloodControl
₹19,500
1 Sept 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil. | 0.6 | Cum | 256.85 | ₹154.11 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | - | Cum | 187.3 | - |
| 3 | Providing and Laying of dry stone soling. | - | Cum | 937.9 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 mix 40 mm nominal size crushed. | - | Cum | 5,202.9 | - |
| 5Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 5.1 | Foundations, footings, bases for columns. | 7.92 | sqm | 286.35 | ₹2,267.89 |
| 5.2 | Columns | 17.28 | sqm | 723.2 | ₹12,496.9 |
| 5.3 | Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc | 24 | sqm | 628.95 | ₹15,094.8 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level with 1:1.5:4 mix (20 mm nominal size) crushed | - | Cum | 7,788.4 | - |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement with mix: 1:1½:3 (20 mm nominal size) crushed | 1 | Cum | 9,395.7 | ₹9,386.3 |
stage.html
html • 0.03 MB
finance_1064701.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
BOQ_1064701.xls
BOQ • 0.30 MB
Corrigendum.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .