Tender Value
Refer Docs
EMD Value
₹84,000
Closing Date
20 Jul 2022, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI COLLECTORATE MADURAI -625020
Providing Interlocking CC Paver blocks and other improvements to the Streets and Lanes _17 nos. in AGAMT-II-2021-22 Village panchayats of Alanganallur Block in Madurai District in Package no. ALR -02
2022_RDTN_240526_1
568/2022/D7 /Alan02/24.06.22
Open Tender
Civil Works
Item Rate
180 days
ALANGANALLUR
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹84,000
1 Aug 2022
8 Jul 2022
20 Jul 2022
11 Jul 2022
20 Jul 2022
11 Jul 2022
Amount
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Supplying filling of conveyed Earth in layers not more than 30 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Plastering with CM 1:4, 20 mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Provision for Name bord Charges etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying filling of conveyed Earth in layers not more than 30 cm thick ,well rammed, wattered and compacted etc,complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Provision for Name bord Charges etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying filling of conveyed Earth in layers not more than 30 cm thick ,well rammed, wattered and compacted etc,complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Provision for Name bord Charges etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying filling of conveyed Earth in layers not more than 30 cm thick ,well rammed, wattered and compacted etc,complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Provision for Name bord Charges etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Supplying filling of conveyed Earth in layers not more than 30 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Provision for Name bord Charges etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying filling of conveyed Earth in layers not more than 30 cm thick ,well rammed, wattered and compacted etc,complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Provision for Name bord Charges etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying filling of conveyed Earth in layers not more than 30 cm thick ,well rammed, wattered and compacted etc,complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Provision for Name bord Charges etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:2:4 (one cement, two sand, and four hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Provision for Name bord Charges etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying filling of conveyed Earth in layers not more than 30 cm thick ,well rammed, wattered and compacted etc,complete
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete
Provision for Name bord Charges etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
H SRI HARI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .