| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-AOC | ₹18.1 L | L1 | Accepted-AOC Eligible |
| 2 | L2₹18.2 LRejected-Finance | ₹18.2 L | L2 | Rejected-Finance In Eligible |
| Sl No | Description | Qty | Unit | SREE VALLI AND CO L2 | M.VENKATESH L1 |
|---|---|---|---|---|---|
| 1.00Earth Work Excavation for foundation in all types of soils and sub soils to full depth (such as Soils in Rock / Silt / Light Black Cotton Soil / Ordinary Soil ) except in rock requiring blasting but inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated earth other than sand in layers of 150 mm thick well rammed and consolidated, depositing the surplus earth in places shown by the Departmental Officers with initial lead of 10 m and initial lift of 2 m. Complete as per TNSS 23 & 24, V, VI (S2), VII, 9,10 | |||||
| 1.10Compound wall | |||||
| 1.20 | column | 152 | M3 | 266 ₹40,432 | 263.75 ₹40,090 |
| 1.30 | Plinth Beam | 6.18 | M3 | 132 ₹815.76 | 131.85 ₹814.83 |
| 2.00Plain Cement Concrete of mix 1 : 4 : 8 (One part Cement, four part sand & eight part of aggregates) using 40mm gauge hard broken metal from approved quarry including all cost, conveyance of materials to site with proper mixing, compacting, finishing and curing etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | |||||
| 2.10 | Compound wall | 12 | M3 | 5,690 ₹68,280 | 5,687.9 ₹68,254.8 |
| 3.00Supplying and errecting centering for Sides and Soffits including necessary supports and strutting upto3.29mt height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheets of size 90mm x60mm and 10BG stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia supported at not more than 75cm centre to centre etc complete Complying with standard Specification without Strutting.TNSS NO or NBC No 30(S) 86 86 A V, VI(S3)VII | |||||
| 3.10Compound wall | |||||
| 3.20 | Plinth Beam | 150 | M2 | 578 ₹86,700 | 575.4 ₹86,310 |
| 3.30 | For Column | 206 | M2 | 1,127 ₹2,32,162 | 1,125.1 ₹2,31,770.6 |
Tender Value
₹22 L
EMD Value
₹22,000
Closing Date
9 Feb 2026, 3:00 pmClosed
Executive Officer
Kannampalayam Town Panchayat Kannampalayam Coimbatore 641402
General Fund 2025-26 Construction of Compound Wall and Sump to Office Building in Kannampalayam Town Panchayat
2026_DTP_650255_1
34/2026
Open Tender
Civil Works
90 days
Kannampalayam Town Panchayat Office
As per Norms
3 documents required · 3 mandatory
₹0
₹22,000
28 Mar 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
2 Feb 2026 - 9 Feb 2026
Earth Work Excavation for foundation in all types of soils and sub soils to full depth (such as Soils in Rock / Silt / Light Black Cotton Soil / Ordinary Soil ) except in rock requiring blasting but inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated earth other than sand in layers of 150 mm thick well rammed and consolidated, depositing the surplus earth in places shown by the Departmental Officers with initial lead of 10 m and initial lift of 2 m. Complete as per TNSS 23 & 24, V, VI (S2), VII, 9,10
Compound wall
column
Plinth Beam
Plain Cement Concrete of mix 1 : 4 : 8 (One part Cement, four part sand & eight part of aggregates) using 40mm gauge hard broken metal from approved quarry including all cost, conveyance of materials to site with proper mixing, compacting, finishing and curing etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Compound wall
Supplying and errecting centering for Sides and Soffits including necessary supports and strutting upto3.29mt height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheets of size 90mm x60mm and 10BG stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia supported at not more than 75cm centre to centre etc complete Complying with standard Specification without Strutting.TNSS NO or NBC No 30(S) 86 86 A V, VI(S3)VII
Compound wall
Plinth Beam
For Column
Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials)
Compound wall
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors as per standard specification.
Compound wall
Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best fly ash Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications
Compound wall
Plastering in Cement Mortor 1:5 Mix (one cement, five M-sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Compound wall
Supply and fixing of M.S Grills For Compound wall with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
Compound wall
Supplying and fixing in position of 0.60 x 0.60 m size water tight C.I Manhole frame with cover of approved pattern at the roof slab including the cost of men & materials complying with standard specification and as directed by the Engineers.
Painting the new walls with Exterior Emulsion paint Two coats with good quality of approved Emulsion paint complete in all floorscomplying with standard specification.( The Colour and shade of the paint shall be got approved by the departmental officers.)
Compound wall
Painting two coats over the new iron work using ready mixed enamel paint including cost of all materials to site and all labour charges for mixing applying etc., Complete as per Standard Specifications
Compound wall
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_779623.xls
BOQ • 0.36 MB
BID.pdf
Additional Documents • 0.48 MB
Download all tender documents and submit your bid