Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.4 LAccepted-AOC VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | L1 | Accepted-AOC L1 | |
| 2 | L2₹63.9 L+₹1.5 L (2.41%)Rejected-Finance 00 0 FATEHPUR NEAR SAHARA FARM BAKKAS LUCKNOW LUCKNOW UTTAR PRADESH 226002 | LUCKNOW | UTTAR PRADESH | 226002 | L2 | Rejected-Finance L2 | |
| 3 | L3₹64.6 L+₹2.2 L (3.55%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹68.4 L+₹6.0 L (9.53%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | Rejected-Technical VILLAGE POST FATEHPUR SANGAT GOSAIGANJ DISTRICT SULTANPUR | GOSAIGANJ | SULTANPUR | UTTAR PRADESH | - | Rejected-Technical As Per Uploaded |
| Sl No | Description | Qty | Unit | M/S ADITYA CONSTRUCTION COMPANY L1 | M/S ARYA ENTERPRISES L2 | M/S JITENDRA SINGH L3 | santosh kumar pal L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work by power transport for a lead up to 1 km including excavation loading,unloading, stacking ,manual compaction & dressing including all lift shall be applicabale for lead up to 1 km excuding royalty . | 2,691 | Cum | 120 ₹3,22,920 Lowest | 150 ₹4,03,650 | 120 ₹3,22,920 Lowest | 165 ₹4,44,015 |
| 2.00 | Dry earth work in foundation masonary work/RCC work on canal including lead upto 30 m & lift upto 1.5 m and its disposal . | 772 | Cum | 80 ₹61,760 | 75 ₹57,900 Lowest | 80 ₹61,760 | 200 ₹1,54,400 |
| 3.00 | Laying P.C.C M-15(1:2:4) in foundation with cement , 20 to 40 mm size crushed stone grit, coarse sand with FM not less than 2 including cost of all material labour and t&p etc. required for proper completion of work. | 42 | Cum | 8,500 ₹3,57,000 | 8,750 ₹3,67,500 | 8,000 ₹3,36,000 | 7,000 ₹2,94,000 Lowest |
| 4.00 | Laying C.C. M-20 (1:1.5:3) in foundation with cement , 4.75 to 20mm (A20) size crushed stone grit,coarse sand with FM not less than 2 including cost of all material labour and T&P etc. required for proper completion of work. | 356 | Cum | 9,000 ₹32,04,000 Lowest | 9,750 ₹34,71,000 | 9,200 ₹32,75,200 | 9,800 ₹34,88,800 |
| 5.00 | Centering & Shuttering for RCC work per sqm including cost of all material labour and T&P etc. required for proper completion of work. | 1,625.59 | Sqm | 450 ₹7,31,515.5 | 295 ₹4,79,549.05 Lowest | 600 ₹9,75,354 | 400 ₹6,50,236 |
| 6.00 | Cutting bending binding and placing TMT steel for reinforcement in RCC work including cost of binding wire all material labour and T&P etc required for proper completion of work. | 24.09 | MT | 65,000 ₹15,65,850 | 67,000 ₹16,14,030 | 62,000 ₹14,93,580 Lowest | 75,000 ₹18,06,750 |
Tender Value
₹81.2 L
EMD Value
₹1.6 L
Closing Date
6 Mar 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
COUNTER BERM WITH RETAINING WALL BETWEEN KM . 3.200 TO KM. 3.600 OF BANSGAON DY.
2026_UPIDC_1111712_7
07/S.E/2025-26
Open Tender
Civil Works
Item Wise
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,958
₹1.6 L
10 Apr 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
Earth work by power transport for a lead up to 1 km including excavation loading,unloading, stacking ,manual compaction & dressing including all lift shall be applicabale for lead up to 1 km excuding royalty .
Dry earth work in foundation masonary work/RCC work on canal including lead upto 30 m & lift upto 1.5 m and its disposal .
Laying P.C.C M-15(1:2:4) in foundation with cement , 20 to 40 mm size crushed stone grit, coarse sand with FM not less than 2 including cost of all material labour and t&p etc. required for proper completion of work.
Laying C.C. M-20 (1:1.5:3) in foundation with cement , 4.75 to 20mm (A20) size crushed stone grit,coarse sand with FM not less than 2 including cost of all material labour and T&P etc. required for proper completion of work.
Centering & Shuttering for RCC work per sqm including cost of all material labour and T&P etc. required for proper completion of work.
Cutting bending binding and placing TMT steel for reinforcement in RCC work including cost of binding wire all material labour and T&P etc required for proper completion of work.
stage.html
html • 0.05 MB
techsummary_2083729.pdf
BOQ Comparative Chart
xlsx
finsummary_2083729.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
BOQ_2083729.xls
BOQ • 0.28 MB
Buklet_2.pdf
Tender Documents • 3.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .