Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC OLD NO 36 NEW NO 16 7TH EAST MAIN ROAD GANDHI NAGAR VELLORE 632 006 | VELLORE | VELLORE | TAMIL NADU | 632006 | ₹1.1 Cr Quoted ₹1.2 Cr | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | C P PRABHAKARAN L1 |
|---|---|---|---|---|
| 1.00 | Clearing of Julifora Jungle with Uprooting with initial lead of 100 m including labour charges, complete etc. | 2,400 | Sq.m | 10.5 ₹25,200 |
| 2.00 | Site Levelling and Grading including Cutting of excess earth and filling in low lying area and removal of boulders from site by engaging JCB and tipper 10 tonnes with initial lead of 200 m including cost of labour, lift etc, | 20 | Hrs. | 950 ₹19,000 |
| 3.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. in hard gravelly soil | 659 | m³ | 290 ₹1.9 L |
| 4.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. In SDR (Not Requiring Blasting) | 132 | m³ | 432 ₹57,024 |
| 5.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. Medium rock and dense medium rock not requiring blasting | 44 | m³ | 758 ₹33,352 |
| 6.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. Removal of hard rock by wedging and chiselling and trimming to proper shape | 44 | m³ | 4,000 ₹1.8 L |
| 7.00 | Providing anti- termite protection treatment (Pre-Construction) for the Foundation and flooring of control room extension portion by drilling holes of 150mm depth at 300mm C/C and filling the holes with anti termite liquid and refilling the holes with earth compacted by plate compaction as per IS 6313(Part-II) including cost of all materials, Labour charges, Lead, Lift, T&Ps ,Charges for plate compaction etc., complete . | 23 | Sq.m | 310 ₹7,130 |
| 8.00 | M.Sand filling for levelling coarse for foundations, grade beam of control room extension portion including cost of M.sand, filling charges, labour for watering and consolidation leads and lift etc., complete. | 4 | m³ | 2,260 ₹9,040 |
| 9.00 | PCC 1:3:6 using 40 mm size hard broken stone jelly without formwork excluding cost of centering shuttering reinforcement grills and fabrication charges but including cost of cement(of approved brand), labour charges, curing, consolidation, all lead, all lift, loading and unloading charges etc. complete. (Without form work) | 58 | m³ | 6,880 ₹4.0 L |
| 10.00 | PCC 1:2:4 using 12 to 20 mm HBG metal for foundation plinth concrete, cable duct bottom slab without form work, including cost of cement (of approved brand) and all other materials, labour, lead, lift, curing, consolidation etc. complete (without form work) | 183 | m³ | 8,015 ₹14.7 L |
Tender Value
Refer Docs
EMD Value
₹93,400
Closing Date
16 Oct 2025, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 110 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32.
Civil works for ratio introduction 110/33 kV at existing Salai 110/11 kV SS
2025_EB_611065_1
TP1-91/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
180 days
SALAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹93,400
30 Mar 2026
3 Oct 2025
17 Oct 2025
3 Oct 2025
16 Oct 2025
3 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_730198.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid