Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.2 L+₹440.53 (0.20%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.2 L+₹1,541.87 (0.70%)Admitted-Finance 115 SUBHAH PURI DAURALA MEERUT UTTAR PRADESH 250221 | MEERUT | UTTAR PRADESH | 250221 | L3 | Admitted-Finance |
Tender Value
₹2.6 L
EMD Value
₹12,996
Closing Date
27 Apr 2026, 12:00 pmClosed
Office EO NP Harra
Office EO NP Harra
Repair of toilet of the primary school of the body and construction of multiple handwash.
2026_DOLBU_1133733_1
006/NPH/2026-27 Date 04/04/2026
Open Tender
Civil Works
Fixed-rate
30 days
Office EO NP Harra
3 documents required · 3 mandatory
₹307
Office EO NP Harra
₹12,996
7 May 2026
6 Apr 2026
27 Apr 2026
6 Apr 2026
27 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Existing plaster of wall including supply of all material,labour and T&P etc.required for proper completion of work | - | Cum | - | - |
| 2 | Dismantling of Cement concrete floor including supply of all material,labour and T&P etc.required for proper completion of work | - | Cum | - | - |
| 3 | Earth work in excavation in ordinary soil upto 1.5 M & lead upto 30 M including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of work | - | Cum | - | - |
| 4 | Concrete in 1:6:12 with cement,fine sand and stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. | - | Cum | - | - |
| 5 | M-150 brick work in 1:4 with cement,coarse sand mortar in foundation including supply of all material,labour and T&P etc.required for proper completion of work | - | Cum | - | - |
| 6 | M-150 brick work in 1:4 with cement,coarse sand mortar in super structure including supply of all material,labour and T&P etc.required for proper completion of work | - | Cum | - | - |
| 7 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in plinth beam,tie beam i/c supply of all material,labour and T&P etc.including all complete of work | - | Cum | - | - |
| 8 | Mild steel or iropn work suchg as reinforced including supply of all material,labour and T&P etc.required for proper completion of work | - | qtl | - | - |
| 9 | 12mm thick Plaster in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work | - | sqm | - | - |
| 10 | Cement concrete in 1:2:4 with approved coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.25 MB
Tendernotice_2.pdf
PDF • 0.49 MB
BOQ_2116304.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .