Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC DOLLYGUNJ SRI VIJAYA PURAM | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | L1 | Accepted-AOC 1st lowest | |
| 2 | L2₹3.5 L+₹16,338 (4.84%)Rejected-Finance | L2 | Rejected-Finance 2ND LOWEST | |
| 3 | L3₹3.9 L+₹49,706.40 (14.7%)Rejected-Finance | L3 | Rejected-Finance 3RD LOWEST | |
| 4 | L4₹3.9 L+₹55,350 (16.4%)Rejected-Finance VALLUVAR NAGAR BAMBOOFLAT SOUTH ANDAMAN PIN 744107 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744107 | L4 | Rejected-Finance 4TH LOWEST | |
| 5 | L5₹4.0 L+₹60,294 (17.9%)Rejected-Finance | L5 | Rejected-Finance 5TH LOWEST |
Tender Value
₹4.6 L
Closing Date
2 Feb 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deputy Conservator of Forests
Silva Complex, Horticulture Road, Haddo
Construction of Foot Path (60m L x 1.00m W) with chequered Tiles within Marine Hill under Silviculture Division.
2022_DCFSL_4994_1
Silva/G-343/576
Open Tender
Construction Works
Works
45 days
Silviculture Camp, Marine Hill
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
28 Apr 2022
19 Jan 2022
3 Feb 2022
19 Jan 2022
2 Feb 2022
19 Jan 2022
270 days
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/ Manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out and disposal of surplus excavated soil as directed within a lead of 50m. All kinds of soil (foot path)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead up to 50m and lift upto 1.5m. 20 % of excavated earth
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All works upto plinth level:1:2:4 (1 cement: 2 coarse sand(Zone III): 4 Graded stone aggregate of 20 mm nominal size) Footpath
Providing and laying in position cement concrete of specific grade excluding the cost of centring and shuttering. All works upto plinth level:1:4:8 (1 cement: 4 coarse sand(Zone III): 8 Graded stone aggregate of 40 mm nominal size)Footpath
Centring and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc (wall)
Chequerrred precast cement concrete tiles 22mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc complete on 20 mm thick bed of cement mortar 1:4 (1 cement : 4 coarse sand) with Light shade pigment using white cement
12mm cement plaster of mix: 1:4 (1cement :4 fine sand)
SONA MONA TRADERS
M/s V ALAGAR SAMY & SONS
M/s Ammu Construction
B S ENGINEERING
Haneefa Constructions
SPR CONSTRUCTION
M/S HABIB CONSTRUCTION
CRESCENT CONSTRUCTION
R K SAHOO CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .