| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical | Accepted-Technical ok |
| 3 | Accepted-Technical 866 67 TELI MANDI AMBALA CANTT AMBALA HARYANA | AMBALA | HARYANA | 133001 | Accepted-Technical ok |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
10 Feb 2026, 4:00 pmClosed
Executive Engineer Division Kasumpti HPPWD Shimla
Executive Engineer Division Kasumpti HPPWD Shimla-3
Repair and Maintenance of Civil works including water supply and sanitary Installation (Block-A)
2026_PWD_127110_1
SD-I-CTR-Tender-2025-2026- 22831 dated 31-01-2026
Open Tender
Civil Works
Percentage
120 days
Shimla
As per SBD
15 documents required · 15 mandatory
₹2,000
Yes
₹1.5 L
1 Mar 2026
2 Feb 2026
11 Feb 2026
2 Feb 2026
10 Feb 2026
2 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating trenches of required width for pipes, cables, etcetra including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m (One point five metre), including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm (Twenty centimetres) in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m (Fifty metre) Pipes, cables etc. exceeding 80 mm (Eighty milimetres) dia. but not exceeding 300 mm (Three hundred milimetres) dia complete in all respect including carriage of material within all leads, lifts and other. incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 100 | Per running metre | 285 | ₹28,500 |
| 2 | Demolishing cement concrete 1:4:8 (one cement isto four sand isto eight graded / crushedd stone aggregate) or leaner mix (including equivalent design mix) manually/ by mechanical means including disposal of material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 18.04 | Per cubic metre | 836.4 | ₹15,088.66 |
| 3 | Demolishing brick work manually/ by mechanical means in cement mortar including stacking of serviceable material and disposal of material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 5.28 | Per cubic metre | 1,145.9 | ₹6,050.35 |
| 4 | Taking out doors, windows and clerestory window shutters (steel or wood) 3 (three) square metres and below including stacking of serviceable material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 2 | Each | 81.8 | ₹163.6 |
| 5 | Taking out doors, windows and clerestory window shutters (steel or wood) area beyond 3 (three) square metres including stacking of serviceable material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 5 | Each | 108 | ₹540 |
| 6 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 6.58 | Per cubic metre | 2,557.9 | ₹16,830.98 |
| 7 | Dismantling tile work For thickness of tiles upto any thickness in floors and roofs laid in cement mortar including stacking the material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 427.34 | Per square metre | 41.3 | ₹17,649.14 |
| 8 | Dismantling roofing including ridges, hips, valleys and gutters etcwtra and stacking the material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 428.66 | Per square metre | 93.8 | ₹40,208.31 |
| 9 | Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable of material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 427.34 | Per square metre | 32.3 | ₹13,803.08 |
| 10 | Providing and laying in position cement concrete 1:4:8 (One cement isto four sand isto eight graded broken/crushed stone aggregate 40mm (Forty millimetres) nominal size mechanically mixed and vibrated curing complete excluding the cost of centering and shuttering in foundation and plinth including carriage of material within all leads, lifts and other incidentals as per approved drawing, design, specifications and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 1.45 | Per cubic metre | 4,836.2 | ₹7,012.49 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.35 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.22 MB
SBD7564114.pdf
Tender Documents • 0.21 MB
BOQ_187635.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .