Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.6 L
EMD Value
₹16,000
Closing Date
2 Nov 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Office Thiruporur
Block Development Office Thiruporur
Construction of Compound Wall in Acharavakkam Panchayat Union Primary School in Sembakkam Panchayat in Thiruporur Panchayat Union
2021_RDTN_209750_2
RCNo -255/2021/A4/dt31.08.2021
Open Tender
Civil Works - Buildings
Item Rate
180 days
Sembakkam
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹16,000
Yes
Block Development Office Thiruporur
2 Nov 2021
26 Oct 2021
2 Nov 2021
26 Oct 2021
2 Nov 2021
26 Oct 2021
28 Oct 2021
90 days
Amount
Construction of Compound Wall in Acharavakkam P.U.Primary School @ Sembakkam panchayat in Thiruporur Panchayat Union. in Chengalpattu District for the Year 2020 - 2021 having Package No . 10/2021 - 2022
Earth work excavation in Hard soil with initial lead and lifts as per SS20B for foundation
Sand filling wirh good dry river sand including cost and conveyance and all other labour charges etc complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc complete
Centring charges for all R.C.C. works including cost and conveyance and all other labour charges etc complete. Uptobasement
Centring charges for all R.C.C. works including cost and conveyance and all other labour charges etc complete.abovebasement
Supply and fabrication of Steel including cost and conveyance and all other labour charges etc.complete.
Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc complete upto basement
Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc complete Above basement
Brick work in Cement Morter 1:5 mix using stock bricks including cost and conveyance and all other labour charges etc complete above basement
Plastering with Cement Morter 1:5 mix 12mm thick including cost and conveyance and all other labour charges etc complete.
Colour washing Two Coat with shell lime with approved colour including cost and conveyance and all other labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SIVAGNANAM
stage.html
html • 0.02 MB
finance_251652.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .