SE EUDC ALIGARH
LAL DIGGI ALIGARH
ELECTRIFICATION WORKS AGAINST SANCTIONED PACKAGES IN THE AREA OF EUDD-2 ALIGARH
2022_DVVNL_712897_1
EUDCA-34/2022-2
Open Tender
Electrical Works
Item Rate
90 days
EUDD-2 ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL AGRA
₹5,000
12 Jul 2022
5 Jul 2022
12 Jul 2022
5 Jul 2022
11 Jul 2022
5 Jul 2022
Amount
Safe carriage of following S.T Poles/ PCC Poles from Store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the repective ends.
11 Mtrs. long S.T.Pole
09 Mtrs. long S.T.Pole
8.5 Mtrs. long PCC Pole
Safe carriage of line material viz. Conductor, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps & other material from store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the respective ends.
Erection of following single support including fixing complete HT/LT fittings as per RESSPO Munual including the cost of labour, T&P and carrier etc. required for proper completion of work.
09 Mtrs. long S.T.Pole
8.5 Mtrs. long PCC Pole
Grouting of single support as per RESSPO Manual including of the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
09 Mtrs. long S.T.Pole
8.5 Mtrs. long PCC Pole
Erection & grouting of 11 Mtrs. ST double pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
Erection & grouting of 8.5 Mtrs. PCC double pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
Laying sagging stringing and binding of ACSR Weasel Conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Laying spreading, lifting and final sagging of Aerial Bunched Cable size 3x50+1x35+1x16 sq.mm. including fixing of all accessories as per RESSPO Manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. :
Laying spreading, lifting and final sagging of Aerial Bunched Cable size 3x120+1x95+1x16 sq.mm. including fixing of all accessories as per RESSPO Manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. :
Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.
Fixing & connecting of earthing rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work.
Fixing of LT Distribution box including making connections of distribution box with LT mains by piercing clamps for Aerial Bunched Cable.The work will also include the opening of the service connection of the consumer and its connecting in distribution box.
Safe carriage of 250 KVA Distribution Transformer from Electricity Store Centre, Aligarh or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on pole including proper jumpering from 11 KV line to the transformer and also connecting the LT site cables as per RESSPO Manual.
Safe carriage of 63 KVA Distribution Transformer from Electricity Store Centre, Sarsol/Workshop, Jalapur or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on Double Pole including proper jumpering from 11 KV TPMO to the transformer and also connecting the LT site cables as per RESSPO Manual.
Neutral & body earthing of Distribution Transformer by digging of pit upto water level depth (approx. 125 feet) and then inserting 1-¼” dia GI pipe of ‘A’ grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material labour, T&P, carrier etc. required for proper completion of work. The aforesaid work shall be carried out as per RESSPO norms.
Construction of plinth at various 11/0.4 KV Sub-station suitable for distribution transformer having size 5’x 5’ x 5’ out which 2’ below the ground. Work will include digging of foundation 2’ deep & brick work with Ist class bricks having cement and sand mortar of ratio 1:6 on all the walls, each of 9” thickness. The area inside the wall shall be duly filled by mud up to the height of appropriate level from ground level and shall be duly watered & rammed. Above the filling C.C. of ration 1:6:12 (Cement sand and brick ballast) giving 4” layer shall be provided. Above C.C. layer RCC layer having 4” thickness and with ratio 1:2:4 of cement sand and stone ballast shall be provided Re-enforcement shall be provided by providing net of (8 Nos. + 8 Nos.) M.S. rods of size 10 mm dia and each of 5’ length in the middle of the top of C.C. layer. The plinth shall be plastered with 12mm thick plaster in ratio 1:4 at all sides. This work will include cost of labour, T&P and all material required for construction of plinth which shall be provided by the contractor as per RESSPO Norms.
Providing and fixing of welded wire mesh fencing around transformer plinth with M.S. Angle of size 35X35X6 mm. length and 1.20 Meters height, such panels shall be supported on M.S. Angle from of size 40X40X6 mm. having 04 Nos. corner supports of height 1.65 Meters including extended legs for grouting which will be used as a door for entry of the personnel or removal/shifting of transformer with welded hinges, sliding belt etc. for locking the arrangement as per drawing and specifications the fencing will be painted one coat of red oxide primer and then two coats of bus green synthetic enamel paint. The rates should be inclusive of all materials required for proper completion of above work (length of each fencing approx. 11 Meters)
Fabrication of T-Off Channel as per RESSPO Norms.
Fabrication of Top Channel as per RESSPO Norms.
Fabrication of Dropper Channel as per RESSPO Norms.
Fabrication of T/F Base Channel/Angle as per RESSPO Norms.
Safe carriage of LT Protection System (Tell Less Unit) and its proper installation at pit site as per RESSPO Manuals
K.D. (INDIA)
P K ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .