| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC Lowest Tenderer |
| 2 | L2₹1.9 Cr+₹15.5 L (9.00%)Rejected-Finance | ₹1.9 Cr+₹15.5 L (9.00%) | L2 | Rejected-Finance Other then Lowest |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
1 Jun 2023, 2:00 pmClosed
Forest Engineer Tiruchirappalli Division
Office of the Forest Engineering Division Tirichirappalli, Chief Conservator of Forest Office Campus, Senthuram Street, JK Nagar, Trichy-620023
Improvement works to Pachalur - Sembirankulam to length in Km 3.08 in Dindigul District.
2023_TNFD_316664_3
TN365 / 2023-24 / D
Open Tender
Civil Works - Roads
Item Rate
240 days
Dindigul
as per Tender Document
7 documents required · 7 mandatory
₹0
₹1.8 L
26 Jun 2023
19 May 2023
2 Jun 2023
19 May 2023
1 Jun 2023
25 May 2023
Amount
Clearing light jungle with uprooting including labour charges for removing and clearing as directed by Forest Engineer incharge including all other incidental charges etc.,
Picking the existing BT surface upto 80mm depth as directed by the departmental officers and levelling the surface including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications.
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250 mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, ll other incidental charges etc., complete as perClause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
Providing and laying 50mm consolidated thick Bituminous Macadam using 0.20 cum fo 26.50-13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below size IRC metal with 37 Kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grade II
Providing and laying Bituminous Concrete to 30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTHRev-5 Grade II
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Vth Rev., 111, 112 & 201.Refilling with eacavated Side earth for making Berms
Providing and laying of Gravel including cost and conveyance of the same to worksite from approved quarry including stacking the same to departemental gauge for premeasurement including all labour charges for laying, spreading, including all hire and fuel charges for power roller for compaction,etc.,complete and as directed by the departmental engineers for making up of low berms.
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803
Providing arid erecting Single sided Double Guard Metal Beam Crash Barrier System 1.7Om high, comprising of 3mm thick wall "W" beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/ 360 and dip galvanized having Zinc Mass of 550gms / sqm, minimum 95Omm above road/ ground level fixed on ISMC series channel vertical post l50x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800rnm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS: 1367 clause 4.60 all complete as per Technical Specification arid as directed by the Engineer-in-charge
RM Constructions
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_375881.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .