Tender Value
₹8.9 Cr
EMD Value
₹11.3 L
Closing Date
25 Aug 2026, 11:00 amDue tomorrow
Round the Clock Operation Routine and
9572225
GEM/2026/B/7756391
Two Packet Bid
Round the clock operation and preventive maintenance work,Dismantling and shifting of ASP,Shifting
Sonbhadra, Uttar Pradesh
Total value wise evaluation
BOQ
1 document required · 1 mandatory
DCAO, Obra Thermal Power station, Obra, Sonebhadra (U.P.)-231219, (Uprvunl Ltd.'c'thermal Power Station,obra Sonebhadra)
₹11.3 L
25 Aug 2026
10 Jul 2026
25 Aug 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Round the clock operation and preventive maintenance work | Round the Clock Operation Routine and Preventive mechanical maintenance and housekeeping and cleaning works of Complete Ash Handling Plant of 2X660MW CTPS Obra, Sonebhadra. | 2,193 | Job | ee_ahd_ctps_obra | 731 |
| 2 | Dismantling and shifting of ASP | Dismantling and shifting of Ash Slurry Pump from its foundation to maintenance bay | 18 | EA | ee_ahd_ctps_obra | 731 |
| 3 | Shifting of overhauled or New ASP | Shifting of Overhauled New Ash Slurry Pump from maintenance bay to the foundation of Pump | 18 | EA | ee_ahd_ctps_obra | 731 |
| 4 | OH of ASP | Complete overhauling of Ms Indure make Ash Slurry Pumps | 18 | EA | ee_ahd_ctps_obra | 731 |
| 5 | Dismantling and shifting of Coarse Ash Pump | Dismantling and shifting of Coarse Ash Pump from its foundation to maintenance bay | 6 | EA | ee_ahd_ctps_obra | 731 |
| 6 | Shifting of overhauled or New Coarse Ash Pump | Shifting of Overhauled New Coarse Ash Pump from maintenance bay to the foundation of Pump | 6 | EA | ee_ahd_ctps_obra | 731 |
| 7 | OH of Coarse Ash Pump | Complete overhauling of Ms Indure make Coarse Ash Pump | 6 | EA | ee_ahd_ctps_obra | 731 |
| 8 | Dismantling and Shifting of VP | Dismantling and Shifting of Vacuum Pumps from its foundation to maintenance bay | 36 | EA | ee_ahd_ctps_obra | 731 |
| 9 | Shifting of Overhauled or New VP | Shifting of Overhauled New Vacuum Pumps from maintenance bay to the foundation of the pump | 36 | EA | ee_ahd_ctps_obra | 731 |
| 10 | Manpower assistance for OH of VP | Providing manpower assistance for Overhauling of Vacuum Pumps in presence of OEM TA Make vacuunair aeromatic Capacity 3871 cubic meter per hour | 36 | EA | ee_ahd_ctps_obra | 731 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9572225.pdf
GEM_BID • 0.29 MB
scope_of_work_ahd_2026-07-07-17-57-49_32f67a05d11f42c648f4793b57f47093.pdf
BOQ • 0.63 MB
boq_2026-07-07-17-57-49_469d3e0fbf815d1f6c421aa9478dd05e.csv
BOQ • 0.01 MB
TSD1_6b4312f0-efde-475d-8cb31783429044801_ee_ahd_ctps_obra.pdf
GEM_OTHER • 0.99 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].