Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹1.2 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT-IV. | 8 | Nos | 578 ₹4,624 |
| 2.00 | Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-4A & 4B. | 4 | Nos | 3,984 ₹15,936 |
| 3.00 | Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT. | 4 | Nos | 5,428 ₹21,712 |
| 4.00 | Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT & SP. | 4 | Nos | 7,249 ₹28,996 |
| 5.00 | Charges for Inspection and checking tightness of generator Phase & Neutral side links. | 4 | Nos | 3,757 ₹15,028 |
| 6.00 | CRC 500ml | 4 | Nos | 4,010 ₹16,040 |
| 7.00 | Cost of Consumables | 8 | Nos | 2,721 ₹21,768 |
Tender Value
Refer Docs
EMD Value
₹1,200
Closing Date
1 Aug 2025, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-I Complete Overhaul of Hydrogen Cooler 1 to 4 in Turbo Generator -IV casing during AOH 2025 of Unit IV
2025_EB_582612_1
CE-MTPSI-SE-ES-EM-I-OT44-25-26
Open Tender
Electrical Works
15 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹1,200
Yes
14 May 2026
17 Jul 2025
2 Aug 2025
17 Jul 2025
1 Aug 2025
17 Jul 2025
Amount
Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT-IV.
Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-4A & 4B.
Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT.
Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT & SP.
Charges for Inspection and checking tightness of generator Phase & Neutral side links.
CRC 500ml
Cost of Consumables
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_696177.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid