| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC | ₹13.8 L | L1 | Accepted-AOC Less Quoted |
| 2 | L2₹14.0 LRejected-AOC | ₹14.0 L | L2 | Rejected-AOC Above Quoted |
| Sl No | Description | Qty | Unit | S.DEVERAJAN L2 | S MANOHARAN L1 |
|---|---|---|---|---|---|
| 1.00Name of Work : Providing CC Pavement With RCC Culvert to Arasamaratheru ( Alvar Nagar) L - 170m , B- 3.75 in Kooram Panchayat Under AGAMT II 2024-25 Estimate Amount : 14.05 Lakhs | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth sides of foundation.As per Ss 20A | 15.3 | cum | 244 ₹3,733.20 | 224 ₹3,427.20 |
| 3.00 | C.C. 1:4:8. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete. | 63.58 | cum | 4,927 ₹3.1 L | 4,907 ₹3.1 L |
| 4.00 | Construction of Granular Sub base by providing well graded material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in ac | 55.93 | cum | 1,500 ₹83,895 | 1,480 ₹82,776.40 |
| 5.00 | Supply and erecting centering for sides and soffits including cost and conveyance and all other labour chargesetc.complete. | 204 | Sqm | 496 ₹1.0 L | 476 ₹97,104 |
| 6.00 | C.C. 1:2:4. Mix using 20MM HBG metal including cost and conveyance and all other labour charges & centering for the side surfaces etc.complete. | 65.41 | Cum | 6,295 ₹4.1 L | 6,275 ₹4.1 L |
| 7.00 | Supplying and fixing of Bitumen pad for expansion joints | 12.83 | Sqm | 250 ₹3,207.50 | 230 ₹2,950.90 |
| 8.00RCC Slab Culvert | |||||
| 9.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth sides of foundation.As per Ss 20A | 34.46 | cum | 260 ₹8,959.60 | 220 ₹7,581.20 |
| 10.00 | C.C. 1:4:8. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete. | 5.17 | cum | 4,927 ₹25,472.59 | 4,907 ₹25,369.19 |
Tender Value
₹14.1 L
EMD Value
₹14,100
Closing Date
12 Mar 2024, 3:00 pmClosed
The Block Development Officer VP Kancheepuram
The Block Development Office Kancheepuram
Providing CC Pavement With RCC Culvert to Arasamaratheru ( Alvar Nagar) L - 170m , B- 3.75 in Kooram Panchayat
2024_RDTN_437805_1
RC No.1009/2024 / KPM 37 A10 Dt.01.03.2024
Open Tender
Civil Works - Roads
90 days
Kancheepuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,100
5 Mar 2026
4 Mar 2024
12 Mar 2024
4 Mar 2024
12 Mar 2024
4 Mar 2024
Amount
Earth work Excavation for Foundation in all soils and Sub Soil to full depth sides of foundation.As per Ss 20A
C.C. 1:4:8. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
Construction of Granular Sub base by providing well graded material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in ac
Supply and erecting centering for sides and soffits including cost and conveyance and all other labour chargesetc.complete.
C.C. 1:2:4. Mix using 20MM HBG metal including cost and conveyance and all other labour charges & centering for the side surfaces etc.complete.
Supplying and fixing of Bitumen pad for expansion joints
RCC Slab Culvert
Earth work Excavation for Foundation in all soils and Sub Soil to full depth sides of foundation.As per Ss 20A
C.C. 1:4:8. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
C.C. 1:3:6. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
Supply and erecting centering for sides and soffits including cost and conveyance and all other labour chargesetc.complete.
Above Ground Level
C.C. 1:2:4. Mix using 20MM HBG metal including cost and conveyance and all other labour charges & centering for the side surfaces etc.complete.
Supply and fabrication of steel for all reinforcement works including cost and conveyance etc.., complete.
R C C 1:1.5 :3 mix using 20mm metal including cost and conveyance etc.., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.DEVERAJAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid