Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-AOC 5 151 B DR SUBRAYAN NAGAR METTUR DAM SALEM 636 401 | SALEM | TAMIL NADU | 636401 | ₹23.0 L Quoted ₹23.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹26.6 LRejected-AOC C3 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹26.6 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical KOLKATA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ANBU ENGINEERING INDIA PRIVATE LIMITED L2 | PRABU ENGINEERING ENTERPRISES PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for Supply of 6 mm MS plate | 9 | MT | 79,118 ₹7.1 L | 71,206 ₹6.4 L |
| 2.00 | Charges for Supply of MS Channel and angles | 3.2 | MT | 61,215 ₹2.0 L | 55,094 ₹1.8 L |
| 3.00 | Charges for dismantling the wornout mill inlet hot air duct at 8 meter level by scaffolding, marking, cutting hot air duct, inspection doors, seal air duct joint & cold air duct joint, leading & lifting, loading and transportation charges and devoluting the retrieved scraps cost of consumables and hire charges for crane , winch and T&P's. | 6 | MT | 11,367 ₹68,202 | 10,231 ₹61,386 |
| 4.00 | Charges for fabrication, erection of mill inlet hot air duct (from main hot airbus to above 9 meter level as per standards and as per the direction of site incharge. work involves fabrication of duct, venturi, expansion bellows, transition bend duct with stiffner Channels angles as per drawing .Complete welding using leak testing leading lifting, loading and transporting charges special electrodes ,cost of consumables and Hire charges for crane, winch and T&P’s. | 12.2 | MT | 1,24,201 ₹15.2 L | 1,11,781 ₹13.6 L |
| 5.00 | Charges for scaffolding, including supporting pipes for arresting the Hot primary air Duct-up stream and down stream of worn-out Expansion Bellow; cutting and removal of worn out Expansion Bellow :gougeing, and edge preparation; leading, lifiting and erection of new/ reconditioned Expansion Below in position ;through welding and providing cover plate inside the Expansion Bellow with one side welding, including cutting and removal of the existing cover plate ;Drawal &devolution of material including the cost of consumables special welding electrodes and hire charges for T&P’s. | 3 | Nos | 54,534 ₹1.6 L | 49,080 ₹1.5 L |
Tender Value
Refer Docs
EMD Value
₹22,700
Closing Date
21 Oct 2025, 2:00 pmClosed
CE NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II M I Circle MPM Unit I Mill 1H Supply fabrication Erection Testing and commissioning after dismantling
2025_EB_611741_1
CE NCTPS II SE M I O M 100 2025 26
Open Tender
Miscellaneous Works
30 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,700
Yes
16 Apr 2026
6 Oct 2025
22 Oct 2025
6 Oct 2025
21 Oct 2025
6 Oct 2025
stage.html
html • 0.04 MB
techsummary_730977.pdf
BOQ Comparative Chart
xlsx
finsummary_730977.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_730977.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid