Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹33.9 LAccepted-AOC | ₹33.9 L | 1ST | Accepted-AOC SUCCESSFUL |
| 2 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
| 3 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
Tender Value
₹33.9 L
EMD Value
₹33,882
Closing Date
25 May 2026, 5:00 pmClosed
COMMISSIONER, SMC
Sambalpur Municipal Corporation Office, Durgapali
Construction of Road and Drain of AN Guha Lane Main Road, Ward No 26 under SMC Sambalpur Ward No 22
2026_ORULB_129180_2
12/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹33,882
Yes
8 Jul 2026
14 May 2026
26 May 2026
14 May 2026
25 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50M lead. | 236.1 | cum | 840 | ₹1,98,324 |
| 2 | Filling in foundatin and plinth with sand watered and rammed including cost of material with tax | 66.7 | cum | 814.1 | ₹54,300.47 |
| 3 | Earthwork in excavation of foundation in hard or gravelly soil with initial lead & lift including rough dressing & levelling the bed etc. complete. | 241.6 | cum | 225.7 | ₹54,529.12 |
| 4 | Removal of excavated dismantled materials away from work site by mechanical means within 5km lead including loading unloading etc complete. | 236.1 | cum | 320.6 | ₹75,693.66 |
| 5 | Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour ,materials with all taxes,lead ,T & P etc all complete . | 93 | cum | 5,758 | ₹5,35,494 |
| 6 | Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete. | 60.8 | cum | 7,397.2 | ₹4,49,749.76 |
| 7 | R.C.C / Unreinforced C.C work M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete but excluding centring , shuttering cost of st | 145.9 | cum | 5,671.8 | ₹8,27,515.62 |
| 8 | supplying fitting fixing and placing uncoated HYSD bar reinforcment complete as per drwing and technical specification | 66.46 | qtl | 8,523.3 | ₹5,66,458.52 |
| 9 | Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials complete in R.C.C. foundation , plinth band , guard wall of lesser height and footings bases of columns mass conc | 1,009.2 | sqm | 247.5 | ₹2,49,777 |
| 10 | Providing, spreading Quarry Rubbish in Sub-Base in layers not exceeding 22.5cm. including watering ,compacting to the required density in O.M.C. with rolling by Vibratory Roller as per O.P.W.D. specifications including cost, conveyance & royalty of all materials,cost of all labour, T & P, labour cess, watering, turfedging, hire & running charges of Vibratory Roller etc. complete. | 50.3 | cum | 1,398.45 | ₹70,342.04 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_591130.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_591130.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .