Loading…
Loading…
Tender Value
₹3.8 Cr
EMD Value
₹7.6 L
Closing Date
2 Sept 2026, 6:00 pm
XEN
Xen office bharatpur
Construction Of Bridge Over The CFCD Canal at Madarpur Road (30x20)
2026_UITBR_587150_1
online nit 40(2026-2027)01bharatpur Development Authorit
Open Tender
Civil Works - Canal
Percentage
bharaptur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Secretary, BDA
₹7.6 L
Yes
Bda office
13 Aug 2026
13 Aug 2026
3 Sept 2026
13 Aug 2026
2 Sept 2026
13 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and Filling Supplying and Filling in plinth with river sand under floors including watering ramming consolidating and dressing complete including cost of sand | 450 | Cum | 1,024 | ₹4,60,800 |
| 2 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand ) including making joints with without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete including painting etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineerin- charge). | 10.8 | Cum | 6,103 | ₹65,912.4 |
| 3 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work | 180 | Sqm | 69 | ₹12,420 |
| 4 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like with pumping set of following H.P. including P.O.L./Power consumption etc. complete. 5 to 9 H.P. | 3,000 | Per Hour | 220 | ₹6,60,000 |
| 5 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In ordinary soil Depth upto 3 metre Depth upto 3 metre | 2,625 | CUM | 190 | ₹4,98,750 |
| 6 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In ordinary soil Depth upto 3 metre Depth upto 3 metre cut of wall | 86.4 | CUM | 190 | ₹16,416 |
| 7 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In ordinary soil Depth upto 3 metre Depth upto 3 metre Return wall | 28.8 | CUM | 190 | ₹5,472 |
| 8 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In ordinary soil Depth upto 3 metre Depth upto 3 metre shear | 50.4 | CUM | 190 | ₹9,576 |
| 9 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. Depth above 3 metre Depth above 3 metre & upto 6 metre | 1,575 | CUM | 225 | ₹3,54,375 |
| 10 | Back filling behind abutment, wing wall and return wall in 150mm layers, with mechanical compaction, complete with all lead and lift as per drawing and technical specification as per MoRTH Specification : Clause : 304 Sandy material | 1,050 | CUM | 350 | ₹3,67,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.38 MB
BOQ_1042878.xls
BOQ • 0.25 MB
biddocument.pdf
Tender Documents • 11.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].