| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 CrAdmitted-Finance | -0.51% | ₹7.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.9 Cr+₹2.0 L (0.25%)Admitted-Finance | -0.26% | ₹7.9 Cr+₹2.0 L (0.25%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical K 1 FIRST FLOOR SHATABTI ENCLAVE SECTOR 49 BAROLA NOIDA | NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | 201301 | - | - | - | Rejected-Technical DOCUMENT NOT OK DETAILS ATTACHED IN PDF |
Tender Value
₹8.0 Cr
EMD Value
₹41.8 L
Closing Date
10 Mar 2026, 3:00 pmClosed
CHIEF ENGG NAGAR NIGAM MEERUT
NNM
Construction work of Sardar Patel Municipal Inter College , Meerut
2026_NNMEE_1121573_4
9033/SNV-4RT-AV/2026
Open Tender
Civil Works
Fixed-rate
180 days
MEERUT
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
MUNICIPAL COMMISSIONER NAGAR NIGAM
₹41.8 L
Yes
30 Mar 2026
2 Mar 2026
10 Mar 2026
2 Mar 2026
10 Mar 2026
2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 1,031.77 | CUM | 135.62 | ₹1,39,928.65 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m | 722.24 | CUM | 149.76 | ₹1,08,162.66 |
| 3 | Diluting and injecting chemical emulsion for PRE-CONSTRUCTIONAL
anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 1,320 | SQM | 236.9 | ₹3,12,708 |
| 4 | Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete. | 99 | CUM | 1,622.7 | ₹1,60,647.3 |
| 5 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural
sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 194.87 | CUM | 5,204.88 | ₹10,14,274.97 |
| 6 | Providing centering & shuttering including strutting, propping etc. & removal of form including all materials, labour and T & P etc. required for proper completion of work all complete Foundation, Footing, base of columns and plinth beam in any shape and size upto plinth level. | 460.07 | SQM | 299.63 | ₹1,37,850.77 |
| 7 | Columns, Pillars, Piers, Abutments, Posts and Struts | 1,803.38 | SQM | 734.51 | ₹13,24,600.64 |
| 8 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 2,872.54 | SQM | 562.66 | ₹16,16,263.36 |
| 9 | Suspended floors, roofs, landings, balconies and access platform | 4,086.25 | SQM | 708.49 | ₹28,95,067.26 |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum All works up to Plinth level. | 309.95 | CUM | 7,262.34 | ₹22,50,962.28 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
4.pdf
Additional Documents • 3.68 MB
BOQ_2087017.xls
BOQ • 0.68 MB
NNMT2.pdf
Tender Documents • 3.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .