Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | ₹3.1 L | L1 | Accepted-AOC accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | SIVA P L4 | M RAVICHANDRAN L2 | M JEGAN L5 | NALLASAMY CONTRACTOR L3 | SELVAMANI SAMAIYADURAI L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Name of Work: Desilting of Keelakulam Village Pillaiyar Kovil Oorani and Ponnakulam Panchayat | ||||||||
| 2.00 | Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2) | 90 | sqm | 6 ₹540 | 5.4 ₹486 Lowest | 7 ₹630 | 6.08 ₹546.75 | 5.4 ₹486 Lowest |
| 3.00 | Earth work in all soils except hard rock requiring blasting
and conveying for formation of bund with lead of 0 to 100
metre deploying earth moving machinery and tippers
including benching, formation of bunds, breaking clods,
sectioning etc., complete (pg no : 32) PWD Schedule of rates | 4,345 | cum | 52 ₹2,25,940 | 41.89 ₹1,82,012.05 Lowest | 53 ₹2,30,285 | 47.12 ₹2,04,714.68 | 41.89 ₹1,82,012.05 Lowest |
| 4.00Construction of Inlet | ||||||||
| 5.00 | Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation. | 13.25 | cum | 224 ₹2,967.55 | 179.3 ₹2,375.37 Lowest | 225 ₹2,980.8 | 201.69 ₹2,671.99 | 179.3 ₹2,375.37 Lowest |
| 6.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 1.48 | cum | 5,609 ₹8,278.88 | 4,487.93 ₹6,624.18 Lowest | 5,610 ₹8,280.36 | 5,048.29 ₹7,451.28 | 4,487.93 ₹6,624.18 Lowest |
| 7.00 | Supplying and erecting centering shuttering including necessary supports for plane | 29.6 | sqm | 476 ₹14,088.24 | 381.25 ₹11,283.91 Lowest | 477 ₹14,117.84 | 428.85 ₹12,692.73 | 381.25 ₹11,283.91 Lowest |
| 8.00 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 9.22 | cum | 6,315 ₹58,233.77 | 5,052.95 ₹46,595.78 Lowest | 6,316 ₹58,242.99 | 5,683.86 ₹52,413.71 | 5,052.95 ₹46,595.78 Lowest |
| 9.00 | Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete. | 5 | RM | 3,750 ₹18,750 | 3,000.38 ₹15,001.9 | 3,750 ₹18,750 | 3,375 ₹16,875 | 3,000.38 ₹15,001.88 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 59,184 ₹59,184 | 47,588 ₹47,588 Lowest | 59,992 ₹59,992 | 53,526 ₹53,526 | 47,588 ₹47,588 Lowest |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
8 Mar 2024, 3:00 pmClosed
Block Development Officer v.p SIVAGANGAI
UNION OFFICE SIVAGANGAI
Desilting of Keelakulam Village Pillaiyar Kovil Oorani and Ponnakulam Panchayat
2024_RDTN_439667_1
SVG-Desilting of Keelakulam Village Pillaiyar Kovil Oorani and Ponnakulam Panchayat
Open Tender
Civil Works
Item Rate
90 days
UNION OFFICE SIVAGANGAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,000
9 Sept 2026
5 Mar 2024
8 Mar 2024
5 Mar 2024
8 Mar 2024
5 Mar 2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .