Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
10 May 2023, 3:00 pmClosed
The Addl. Collector/ Project Director, DRDA, DPI
DRDA, Dharmapuri
Dharmapuri District - Upgradation / Strengthening of the road 4 Nos. in Package No. TN04-32 MGSMT / 2022-2023 Palacode Block P32
2023_RDTN_308641_1
Roc.No.1231/2023/R2 Dt.03.04.2023 MGSMT P32
Open Tender
Civil Works
Item Rate
180 days
DRDA
Can be seen in the tender documents
3 documents required · 3 mandatory
₹0
₹1.4 L
6 Jul 2023
1 May 2023
10 May 2023
1 May 2023
10 May 2023
1 May 2023
Amount
Strengthening of the road from Hosur - Adhiyamankottai road to P.Gollahalli road (via Poduthampatti) Km.0/0-0/980 (Plastic Waste)
Clearing the scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers
Picking up existing BT surface wornout Surface including all labour charges etc
Consturciton of subgrade and earthern shoulders with approved materiasl obtained from borrwo pits with all lifts and leads, transporting to site, spreading, grading required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per Technical Specification Caluse 303.1 (Subgrade using carted Earth)
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete,
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying water bound macadam 75 mm conscidated thickenss with Grade III metal using 1.00 cum of 63 mm to .11.20 mm IRC size HBG Metal with 0.24 cum of Gravel for blindage per 10 Sqm. Including cost and coveyance of all materials to work site and stacking them at the site to departmental gauge for pre-measurement and labour charges for spreading metal and gravel, hand packing to camber, watering with all loads for water and compaction by 80.100 km power roller including hire charges and fuel charges for power employed including necessary earthern bund to protect edges, lighting, guarding, barricadings and maintenance of diversion etc. complete as per clause 404 of most Specification.
Providing & Laying Tack coat 4 kgs / 10 Sqm over the WBM surface treated with using 4 kgs of Bituminous Emulsion for 10 sqm area including cost of Bitumen emulsion, including labour for applying the required Qty. of Bitumen Emulsion as tack coat by bitumen sprayer etc., complete as per clause 503 of Most specifications.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Road marking with hot applied thermoplastic compound with Reflectorising glass beads on bituminous surface etc.,
Provision for 1.5m Span Culvert
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Deck Slab
Provision for WheepHole
Provision for Expansion Joints (Bitumen Pad)
Provision for Well Retaining wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Cement concrete in CC 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting ect., completed with standard specification and directed by the departmental officers.
Cement conerete 1:3:6 (one cement three sand six jelly)using 40.m.m.H.B.G.Jelly for foundation including watering wherever necessary sand laid in layers not more than 15 c.m. thick compacting etc. complete complying with standard specification.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing including cost and conveyance of all materials etc., complete.
Provision for Name Board
Provision for HM Stone
Provision for 90cm Equilateral TriangleSign Board
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
Strengthening of the road from Sekkodi road to Pachiyamankoil road Km.0/0-0/500 (Plastic Waste)
Clearing the scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers
Consturciton of subgrade and earthern shoulders with approved materiasl obtained from borrwo pits with all lifts and leads, transporting to site, spreading, grading required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per Technical Specification Caluse 303.1 (Subgrade using carted Earth)
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete,
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing & Laying Tack coat 4 kgs / 10 Sqm over the WBM surface treated with using 4 kgs of Bituminous Emulsion for 10 sqm area including cost of Bitumen emulsion, including labour for applying the required Qty. of Bitumen Emulsion as tack coat by bitumen sprayer etc., complete as per clause 503 of Most specifications.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Road marking with hot applied thermoplastic compound with Reflectorising glass beads on bituminous surface etc.,
Provision for Name Board
Provision for HM stone
Provision for Sign Board Charges
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
Upgradation of the road from Sekkodi road to Vaithiyakarankottai road Km.0/0-0/750 (Plastic Waste
Clearing the scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers
Consturciton of subgrade and earthern shoulders with approved materiasl obtained from borrwo pits with all lifts and leads, transporting to site, spreading, grading required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per Technical Specification Caluse 303.1 (Subgrade using carted Earth)
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete,
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing & Laying Tack coat 4 kgs / 10 Sqm over the WBM surface treated with using 4 kgs of Bituminous Emulsion for 10 sqm area including cost of Bitumen emulsion, including labour for applying the required Qty. of Bitumen Emulsion as tack coat by bitumen sprayer etc., complete as per clause 503 of Most specifications.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Road marking with hot applied thermoplastic compound with Reflectorising glass beads on bituminous surface etc.,
Provision for Well Retaining wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Cement concrete in CC 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting ect., completed with standard specification and directed by the departmental officers.
Cement conerete 1:3:6 (one cement three sand six jelly)using 40.m.m.H.B.G.Jelly for foundation including watering wherever necessary sand laid in layers not more than 15 c.m. thick compacting etc. complete complying with standard specification.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing including cost and conveyance of all materials etc., complete.
Provision for Name Board
Provision for HM Stone
Provision for Sign Board Charges
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
Strengthening of the road from Dharmapuri - Papparapatti road to Kadukkapatti road Km.0/0-0/930 (Plastic Waste)
Clearing the scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers
Consturciton of subgrade and earthern shoulders with approved materiasl obtained from borrwo pits with all lifts and leads, transporting to site, spreading, grading required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per Technical Specification Caluse 303.1 (Subgrade using carted Earth)
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete,
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying water bound macadam 75 mm conscidated thickenss with Grade III metal using 1.00 cum of 63 mm to .11.20 mm IRC size HBG Metal with 0.24 cum of Gravel for blindage per 10 Sqm. Including cost and coveyance of all materials to work site and stacking them at the site to departmental gauge for pre-measurement and labour charges for spreading metal and gravel, hand packing to camber, watering with all loads for water and compaction by 80.100 km power roller including hire charges and fuel charges for power employed including necessary earthern bund to protect edges, lighting, guarding, barricadings and maintenance of diversion etc. complete as per clause 404 of most Specification.
Providing & Laying Tack coat 4 kgs / 10 Sqm over the WBM surface treated with using 4 kgs of Bituminous Emulsion for 10 sqm area including cost of Bitumen emulsion, including labour for applying the required Qty. of Bitumen Emulsion as tack coat by bitumen sprayer etc., complete as per clause 503 of Most specifications.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Road marking with hot applied thermoplastic compound with Reflectorising glass beads on bituminous surface etc.,
Provision for Name Board
Provision for Sign Board
Provision for HM stone
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sri Shanmuga Builders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .