Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹77.9 LAccepted-AOC | 1 | Accepted-AOC Lowest tenderer | |
| 2 | 2₹82.7 L+₹4.8 L (6.12%)Rejected-AOC | 2 | Rejected-AOC . |
Tender Value
₹79.3 L
EMD Value
₹79,500
Closing Date
12 Jul 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA, 1st floor, Theni
1. Bodi Thevaram road to Alagarnaickenpatty road km 0/0-0/38 2. T.Mettupatty-Alagarnaickenpatty road bomminaickenpatty road Km 0/0-1/0 3. Lakshminaickanpatti-Thamminaickanpatti road to Krishnampatty
2024_RDTN_458916_1
DIPR/2074/Tender/2024 Dated 26.06.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
As per tender documents
3 documents required · 3 mandatory
₹0
₹79,500
DRDA, 1st floor, Theni
7 Aug 2024
4 Jul 2024
12 Jul 2024
4 Jul 2024
12 Jul 2024
5 Jul 2024
5 Jul 2024
Amount
Strengthening the road from Bodi Thevaram road to T.Azhagarnaickanpatty road km 0/0 - 0/380 (R-43) Clearing Scrub Jungle with uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all labour charges etc., complete.
Picking the existing metal surface 7.5 cm much removing the picked up stuff to the sides, collection all useful metal leveling and sectioning top camper power roller ansolidation by power roller etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.e as per standard specification no 503 MOST.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Collection and Supply of Red gravel from the approved quarry incl cost and conveyence of all materials to site incl all labour charges for spreading and compaction with power roller etc for shouklders etc to complete
Earth work excavation borrow pts to filling in all classes of soil such as sand sit or other loose soil, wet sand, or silet not undr water, light black cottong soil, sandy loam and ordinary soil including excavated earth as per SS 20A
Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidation etc., complete.
Cement Concrete 1:2:4 (One Cement, Two sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidation etc., complete.
Road making with Hot applied thermoplastic compound with reflecting Glass Beads on Bituminous Surface
Road markers / Road stud with lens Reflectors
provition for steel sign board
Provision for steel Name board
provision for HM Stone
Drainage Ch. 295/370
Earthwork excavation for foundation in all soils and sub soils and to full depth as may be direacted except in rock requiring blasting but inclusive of shoring, strutting and baling water wherver necessary and depositing the surplus earth within the comp
Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidation etc., complete.
Supplying and erecting, centering for sides and soffits including supports and strutting upto 3.29m height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheet of 90cm x60cm BG 10 guage stiffened with welded M.S. angle of 25 x 25 x 3mm boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10 cm to 13 cm dia spaced at 75 cm centre to centre at suitable intervals etc. complete in all floors complying with standard specification. (The payment for centering shall be made only after the concrete is laid)
Cement Concrete 1:3:6 (One Cement, Three sand and Six hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidation etc., complete.
Cement Concrete 1:2:4 (One Cement, Two sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidation etc., complete.
Plastering with CM 1:5 12mm thick incl cost and conveyance of all material to site and all labour charges etc complete.
Retaining wall 135m to 220m
Earth work excavation in all clauses of soils except hard rock with an initial lead and lift including strutting, bailing out water as per standard speciation etc complete.
Cement concrete -1:4:8using 40 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
supplying ,erecting and centring including cost and conveyance of all materials to site and all labour charges etc(for Ret.
Cement concrete -1:3:6using 40 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
Renewal BT road from T.Mettupatty - T.Azhagarnaickanpatty road to Bomminaickanpatty road 0/0 - 1/0 (R-16)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking the existing metal surface 7.5 cm much removing the picked up stuff to the sides, collection all useful metal leveling and sectioning top camper power roller ansolidation by power roller etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Tack coat over B.T surface using 3.00Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Collection and Supply of Red gravel from the approved quarry incl cost and conveyence of all materials to site incl all labour charges for spreading and compaction with power roller etc for shouklders etc to complete
Earth work excavation borrow pts to filling in all classes of soil such as sand sit or other loose soil, wet sand, or silet not undr water, light black cottong soil, sandy loam and ordinary soil including excavated earth as per SS 20A
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Road markers / road stud with lens reflectors25
provition for steel sighn board
provition for steel name board
Provision for HM stone
Retaining wall Ch 847m
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2M in light black cotton soil, hard stiff clay, stiff black cotton, hard red earth, shales, Muram, gravel stoney earth and etc., as per SS 20B.(TNBP SS No. 23 & 24)
Cement Concrete 1:4:8 (One cement four sand and Eight hard brocken stone) using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Cement Concrete 1:3:6 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Refilling with excavated earth as per stanadard specification
1.5m span RCC slab culvert @ Ch 370
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ).
Up to Ground level
Above Ground level
Cement Concrete 1:2:4 (One Cement, Two sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidation etc., complete.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Strengthening of road branching from Lakshminaickanpatty - Thamminaickanpatty road to Krishnamaptty Km 0/0-0/5 (R29)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking the existing metal surface 7.5 cm much removing the picked up stuff to the sides, collection all useful metal leveling and sectioning top camper power roller ansolidation by power roller etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.e as per standard specification no 503 MOST.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Collection and Supply of Red gravel from the approved quarry incl cost and conveyence of all materials to site incl all labour charges for spreading and compaction with power roller etc for shouklders etc to complete
Earth work excavation borrow pts to filling in all classes of soil such as sand sit or other loose soil, wet sand, or silet not undr water, light black cottong soil, sandy loam and ordinary soil including excavated earth as per SS 20A
Road making with Hot applied thermoplastic compound with reflecting Glass Beads on Bituminous Surface
Road markers / Road stud with lens Reflectors
provition for steel sign board
Provision for steel Name board
provision for HM Stone
Retaining wall 135m to 220m
Earth work excavation borrow pts to filling in all classes of soil such as sand sit or other loose soil, wet sand, or silet not undr water, light black cottong soil, sandy loam and ordinary soil including excavated earth as per SS 20A
Cement concrete -1:4:8using 40 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
supplying ,erecting and centring including cost and conveyance of all materials to site and all labour charges etc
Cement concrete -1:3:6using 40 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
Refilling with excavated earth as per stanadard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P.Sumalatha (BID ID -1078787)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .