Tender Value
₹20.9 L
EMD Value
₹20,950
Closing Date
5 Jul 2025, 12:00 pmClosed
SE EDC I MZN
H NO 60/168 LAXMAN VIHAR KAMBALWALA BAGH MUZAFFARNAGAR
obstructing the widening and strengthening work of shifting single pole double pole conductor distribution transformer and other electrical material of 11 KV Lines and LT Line obstructing the road to another place
2025_PVVNL_1051899_1
08/2025-26/EDC-I MZN
Open Tender
Electrical Works
Lump-sum
UNDER THE AREA OF EDD CHARTHAWAL MZN
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC I MZN
₹20,950
5 Aug 2025
25 Jun 2025
5 Jul 2025
25 Jun 2025
5 Jul 2025
25 Jun 2025
Amount
11 KV Line Shifting Work The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km)
STP 11 Mtr. Long
11 KV XLPE Cable Al. 3x185 Sqmm
Cable Jointing Kit 3x185 Sqmm
ACSR RABBIT Conductor
LINE MATERIAL (Insulator, Disc, X-Arm, Angle, Channel, Earthing Complete, Stay Set E.T.C.)
Complete work of installing the electrical material received from the store center at the site.
Complete work of Laying/Installing ACSR RABBIT CONDUCTOR on the established electric poles installed as per RESPO norms.
Complete work of Laying/Installing 11 KV XLPE CABLE Al. 3x185 Sqmm through HDPE Pipe (20 Mtr.) on the established electric poles installed as per RESPO norms.
Complete Work of Installing underground 11 KV XLPE Cable Al. 3x185 Sqmm through HDPE PIPE at the site as per RESPO norms. Double Circuit 60 Mtr. (60 Mtr. x 2 = 120 Mtr.)
Work of Fixing/Installing Single Pole of the STP Pole 11 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Work of Fixing/Installing Double Pole of the STP Pole 11 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Complete work of Tying/Binding Number Plate on establishing 6 no. Double Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Tying/Binding Danger Board on establishing 6 no. Double Pole/ 47 no. Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Tying/Binding Barbed Wire on establishing 6 no. Double Pole/ 47 no. Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of installation of Stay Set Complete with Concreting on established 13 no. Double pole of Line at the site As per the RESPO standards.
Complete work of Pole concreting on established 6 no. Double Pole / 47 no. Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm.
Complete work of Earthing complete with earthing road of established 6 no. Double Pole / 47 no. Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Installing and Commissioning Cable Jointing Kit 3x185 Sqmm at the site as per RESPO standards.
Complete work of Installing and Commissioning The Guarding on established line for saftey purpose at the site, Prepare with M.S. Angle Both side and G.I.Wire for Net/Jaal established 6 no. Double Pole / 47 no. Single Pole . as per RESPO standards.In which decentralized material will be provide by the Contractor/Firm.
Complete work of dismantling Line to be shifted as per RESPO standards from safety point of view. Approximate 58 no. Electric poles/ 2100 mtr. conductors etc. other material. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work.
Supply of F-Bracket as per RESPO standards
Supply of Cross Arm Holding Clamp as per RESPO standards
Supply of Stone Pad 300x300x75 mm as per RESPO standards
Supply of Danger Board with Clamp as per RESPO standards
Supply of Number Plate as per RESPO standards
Supply of Barbed wire as per RESPO standards
Supply of HDPE Pipe as per RESPO standards
Supply of PG Clamp as per RESPO standards
Supply of Nut & Bolt as per RESPO standards
Supply of Clamp with Nut & Bolt for MS Angle as per RESPO standards
Supply of Clamp with Nut & Bolt as per RESPO standards
As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar.
ST Pole 11 Mtr. Old & Used
ACSR Weasel Conductor Old & Used
Steel Iron Scrap
11 KV Line Shifting Work The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km)
STP 13 Mtr. Long
STP 11 Mtr. Long
11 KV FUSE SET
ACSR RABBIT Conductor
LINE MATERIAL (Insulator, Disc, X-Arm, Angle, Channel, Earthing Complete, Stay Set E.T.C.)
Complete work of installing the electrical material received from the store center at the site.
Complete work of Laying/Installing ACSR RABBIT CONDUCTOR on the established electric poles installed as per RESPO norms.
Work of Fixing/Installing Single Pole of the STP Pole 11 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Work of Fixing/Installing Double Pole of the STP Pole 13 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Work of Fixing/Installing Double Pole of the STP Pole 11 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Work of Fixing/Installing Double Pole of the STP Pole 11 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication & energizing it 11/0.4 KV Distribution Transformer (25 KVA & 100 KVA) as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Complete work of Making New plinth (Size 2x2x1.5 Meter) for 250 KVA Distribution Transformer as per RESPO standards. In which Brick, Cement, Sand and other necessary Decentralized material will be provide by the Contractor/Firm.
Complete work of Installing and Commissioning 250 KVA Distribution Transformer on established Plinth as per RESPO standards.
Complete work of Making New Fencing(Size for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm.
Complete work of Pipe Earthing (upto Water Level) of established 250 KVA Distribution Transformer as per RESPO standards. In which Pipe Earthing and other necessary Decentralized material will be provide by the Contractor/Firm.
Complete work of Tying/Binding Danger Board on establishing 13 no. Double Pole/ 47 no. Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Tying/Binding Barbed Wire on establishing 7 no. Double Pole/ 47 no. Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of installation of Stay Set Complete with Concreting on established 13 no. Double pole of Line at the site As per the RESPO standards.
Complete work of Pole concreting on established 13 no. Double Pole / 47 no. Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm.
Complete work of Earthing complete with earthing road of established 13 no. Double Pole / 47 no. Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Installing and Commissioning 11 KV FUSE SET on establishing Double Pole at the site as per RESPO standards.
Complete work of Installing and Commissioning The Guarding on established line for saftey purpose at the site, Prepare with M.S. Angle Both side and G.I.Wire for Net/Jaal established 13 no. Double Pole / 47 no. Single Pole . as per RESPO standards.In which decentralized material will be provide by the Contractor/Firm.
Complete work of cutting and pruning the branches of trees standing between the 11 KV Line (Approximate 2.0 to 2.5 K.M.) on shifting place/route.
Complete work of dismantling Line to be shifted as per RESPO standards from safety point of view. Approximate 44 no. Electric poles/ 2100 mtr. conductors/ 06 no. 11/0.4 KV Distribution Transformer (25 KVA/100 KVA & 250 KVA) etc other material. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work.
Supply of F-Bracket as per RESPO standards
Supply of Cross Arm Holding Clamp as per RESPO standards
Supply of Stone Pad 300x300x75 mm as per RESPO standards
Supply of Danger Board with Clamp as per RESPO standards
Supply of Barbed wire as per RESPO standards
Supply of PG Clamp as per RESPO standards
Supply of Nut & Bolt as per RESPO standards
Supply of Clamp with Nut & Bolt as per RESPO standards
SUNDRIES ITEMS
As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar.
ST Pole 11 Mtr. Old & Used
ACSR Weasel Conductor Old & Used
Steel Scrap
LT Line Shifting Work The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km)
PCC Pole 8.5 Mtr.
LT ABC 3x95+1x70+1x16 Sqmm
LT ABC 3x120+1x95+1x16 Sqmm
ACSR Weasel Conductor
3 Phase LT Distribution Box
1 Phase LT Distribution Box
LINE MATERIAL (Insulator, Disc, X-Arm, Angle, Channel, Earthing Complete, Stay Set E.T.C.)
Complete work of installing the electrical material received from the store center at the site.
Complete work of Laying/Installing LT ABC 3x95+1x70+1x16 Sqmm on the established electric poles installed as per RESPO norms.
Complete work of Laying/Installing LT ABC 3x120+1x95+1x16 Sqmm on the established electric poles installed as per RESPO norms.
Complete work of Laying/Installing ACSR Weasel Conductor on the established electric poles installed as per RESPO norms.
Work of Fixing/Installing Single Pole of the PCC Pole 8.5 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Complete work of installation of Stay Set Complete with Concreting on established single pole of Line at the site As per the RESPO standards.
Complete work of Pole concreting on established 32 no. Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm.
Complete work of Earthing complete with earthing road of established Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Installing and Commissioning 3 Phase LT Distribution Box at the site as per RESPO standards.
Complete work of Installing and Commissioning 1 Phase LT Distribution Box at the site as per RESPO standards.
Complete work of dismantling Line to be shifted as per RESPO standards from safety point of view. Approximate 32 to 35 no. Electric poles/ 1100 mtr. conductors etc other material. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work.
Supply of Stone Pad 300x300x75 mm as per RESPO standards
Supply of LT Clamp for Shackle Insulator as per RESPO standards
Supply of Shackle Insulator as per RESPO standards
Supply of Dead and Clamp as per RESPO standards
Supply of Suspension Clamp as per RESPO standards
Supply of J-Hook as per RESPO standards
Supply of Nut & Bolt for Shackle Insulator as per RESPO standards
SUNDRIES ITEMS
As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar.
LT ABC 3x95+1x70+1x16 Sqmm Old & Used
LT ABC 3x120+1x95+1x16 Sqmm Old & Used
ACSR Weasel Conductor Old & Used
Divakar Enterprises (BID ID -5280670)
Navitech Technologies Pvt. Ltd. (BID ID -5290829)
Kanika Enterprises (BID ID -5282755)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .