Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.9 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹11.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹12.8 LAdmitted-Fee/PreQual/Technical/Finance RAGHUKUL 37 A 2ND PHASE CROSS ROAD NO 03 ADITYA GARDEN ADITYAPUR | -9.00% | ₹12.8 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.0 LAdmitted-Fee/PreQual/Technical/Finance ADITYAPUR 1 SARAIKELA KHARASWAN | ADITYAPUR | SARAIKELA KHARASWAN | JHARKHAND | +0.00% | ₹14.0 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.0 L
EMD Value
₹28,500
Closing Date
27 Jun 2026, 4:00 pmClosed
AMC Muncipal Corporation Adityapur
Kalpanapuri, Adityapur
Construction of PCC Road from house of Gorango to House of Arun Mehta at MIG Road no. 04 in Dindli Basti in Ward no. 16 Under AMC
2026_UDD_115425_26
UDD/AMC/01/2026-27
Open Tender
Civil Works
Percentage
90 days
Ward No. 16
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹28,500
Yes
7 Jul 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
27 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not excluding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled material up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately . [RCD SOR -2.06 ] | 104.31 | Per M3 | 442.6 | ₹46,167.61 |
| 2 | Disposal of excavated earth in borrow area of lead 1km(K) +2km(P).
(Add 50% extra for loose volume) | 104.31 | Per M3 | 166.07 | ₹17,322.76 |
| 3 | Construction of Granular Sub-Base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. | 104.31 | Per M3 | 1,458.8 | ₹1,52,167.43 |
| 4 | Providing and laying in position cement concrete of grade M-20 with nominal mix (1:1.5:3) excluding the cost of centering and shuttering - All work up to plinth level. [BCD 5.3.1.1] | 139.08 | Per M3 | 4,961.73 | ₹6,90,077.41 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for foundations….do….do….E/I.
[BCD 5.3.17.1] | 76 | Per M2 | 194.5 | ₹14,782 |
| 6 | Construction of sub-grade and earthen shoulder with approved material obtained from borrow pits with all its leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 22.8 | Per M3 | 123 | ₹2,804.4 |
| 7 | Carriage of Materials | - | - | - | - |
| 8 | Sand 1Km(K) + 5Km(P) | 59.8 | Per M3 | 357.4 | ₹21,372.52 |
| 9 | Cement 5Km(P) | 57.8 | Per MT | 456.1 | ₹26,362.58 |
| 10 | Chips 1Km(K) + 40Km(P) | 222.56 | Per M3 | 744.28 | ₹1,65,646.96 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
terms_conditions.pdf
Tender Documents • 0.39 MB
BOQ_156074.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].