Tender Value
₹5.1 L
EMD Value
₹12,700
Closing Date
29 Sept 2026, 4:30 pm2d left
Public Works Department
PRAVEEN R HULJI
Annual Maintanace of Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24 in Ramdurg Taluka for the year 2026-27
PWD/2026-27/RD/WORK_INDENT42085
PWD/2026-27/RD/WORK_INDENT42085
Open
Roads
Electronic Documents, First(One Cover)
PWD Division Office Belagavi
4 documents required · 0 mandatory · 4 optional
₹500
₹12,700
12 Sept 2026
12 Sept 2026
28 Sept 2026
(21) Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24
For Maintenance Length 4.55 11.24 6.69 more than 5 years
0.00 2.10 2.10 less than 5 years
Total Maintenance Length 11.24
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 11.24
GOVERNMENT OF KARNATAKA
(PUBLIC WORKS DEPARTMENT)
COMMUNICATION & BUILDINGS
NORTH (ZONE) DHARWAD
EXECUTIVE ENGINEER
(Public Works Department)
BELGAUM DIVISION BELGAUM
Name of Work : Annual Maintanace of Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24 in Ramdurg Taluka for the year 2026-27
ESTIMATED COST RS :- 6.00 Lakhs
PARAGRAPH 130 (A) OF THE KARNATAKA PUBLIC WORKS DEPARTMENTAL CODE
Division. PWD.Belgaum Division.Belgaum
Sub - Division. PWD, Sub- Dn.Ramdurg.
Fund Head. 3054-MDR MAINTENANCE
Department Head.
Name of Work : Annual Maintanace of Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24 in Ramdurg Taluka for the year 2026-27
Estimated Cost (Rs. In Lakhs) Rs 6.00
Administratively sanctioned under No. Date.
Techanically sanctioned under No. Date.
Estimate prepared by Devaraddi.P. (JE)
Checked by Shri.Ravikumar N .AEE
General Description
:ಪ್ರತ್ಯೇಕವಾಗಿ ಲಗತ್ತಿಸಲಾಗಿದೆ:
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg Executive Engineer, PWD, Belgaum Dn.Belgaum
Name of Work : Annual Maintanace of Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24 in Ramdurg Taluka for the year 2026-27
ರಾಮದುರ್ಗ ತಾಲೂಕಿನ ಆನೆಗುದ್ದಿ ಹಣಮಾಪೂರ ಚೆನ್ನಾಪೂರ ರಸ್ತೆ (ಜಿ.ಮು.ರ) ಕಿ.ಮೀ 0.00 ರಿಂದ 4.55 & 4.55 ರಿಂದ 5.80 & 5.80 ರಿಂದ 11.24 ರವರೆಗೆ ರಸ್ತೆಯ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು ನಿರ್ವಹಣೆಗೆ ಪರಿಗಣಿಸಲಾಗಿದೆ. ಸದರಿ ರಸ್ತೆ ನಿರ್ವಹಣೆ ಮಾಡುವ ಕಾಮಗಾರಿಗಾಗಿ 2026-27 ನೇ ಸಾಲಿಗಾಗಿ ಸಿದ್ಧಪಡಿಸಿದ ಕ್ರಿಯಾ ಯೋಜನೆ ಕ್ರ.ಸಂ. 05 ರನ್ವಯ ಒಟ್ಟು ಮೊತ್ತ ರೂ. 6.00 ಲಕ್ಷ ಲೆಕ್ಕ ಶೀರ್ಷಕೆ ಜಿಲ್ಲಾ ಮುಖ್ಯ ರಸ್ತೆ ನಿರ್ವಹಣೆ ಅಡಿಯಲ್ಲಿ ಅನುವು ಇರುತ್ತದೆ. ವಾಹನ ಸಂಚಾರದಿಂದ ಮತ್ತು ಮಳೆಯಿಂದಾಗಿ ರಸ್ತೆಯ ಮೇಲ್ಮೆಯ ಮೇಲೆ ಸಾಕಷ್ಟು ತಗ್ಗು ಗುಂಡಿಗಳು ಬಿದ್ದಿರುತ್ತದೆ. ಕಾರಣ ಅತೀ ಜರೂರ ಇರುವ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆಯನ್ನು ಮಾಡುವದು ಅವಶ್ಯಕವಿರುತ್ತದೆ. ಒದಗಿಸಿರುವ ಅನುದಾನಕ್ಕೆ ತಕ್ಕಂತೆ ರಸ್ತೆ ಭಾಗದ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆಯನ್ನು ಮತ್ತು ರಸ್ತೆ ಫರ್ನಿಚರಗಳ ಕಾಮಗಾರಿಗಳನ್ನು ಕೈಗೆತ್ತಿಕೊಳ್ಳಲಾಗಿದೆ.
ಈ ಅಂದಾಜು ಪತ್ರಿಕೆಯಲ್ಲಿ ಈ ಕೆಳಗಿನ ಅಂಶಗಳನ್ನು ಅಳವಡಿಸಲಾಗಿದೆ.
1) ಜಂಗಲ ತೆಗೆಯುವುದು.
2) ಎಸ್.ಡಿ.ಬಿ.ಸಿ. ನಿಂದ ಗುಂಡಿಗಳನ್ನು ತುಂಬುವುದು.
3) Road Furnitures ಒದಗಿಸುವದು.
4) ಕಿ.ಮಿ. ಕಲ್ಲುಗಳಿಗೆ ಬಣ್ಣ ಬಳಿಯುವದು.
5) ಅಡ್ಡಮೋರಿಗಳ ಗೊಡೆಗಳಿಗೆ ಸುಣ್ಣ ಬಣ್ಣ ಬಳಿಯುವದು.
6) ರಸ್ತೆ ಬಾಹುಗೆ ಮೊರಮ್ ಅಳವಡಿಸುವದು.
ಈ ಅಂದಾಜು ಪತ್ರಿಕೆಯನ್ನು ಕರ್ನಾಟಕದ 2023-24ನೇ ಸಾಲಿನ (2026-27ನೇ ಸಾಲಿಗೆ ಮುಂದುವರೆದ) ರಾಜ್ಯವ್ಯಾಪಿ ಏಕರೂಪ, ಕಟ್ಟಡ, ರಸ್ತೆ & ಸೇತುವೆ ಅನುಸೂಚಿತ ದರಪಟ್ಟಿಯಂತೆ ಈ ಅಂದಾಜು ಪತ್ರಿಕೆಯನ್ನು ನಿಗಧಿಪಡಿಸಿದ ಒಟ್ಟು ಮೊತ್ತ ರೂ. 6.00 ಲಕ್ಷಗಳಿಗೆ ತಯಾರಿಸಲಾಗಿದೆ.
ಸಹಾಯಕ ಕಾರ್ಯನಿರ್ವಾಹಕ ಇಂಜೀನಿಯರರು, ಲೋಕೋಪಯೊಗಿ ಇಲಾಖೆ ಉಪವಿಭಾಗ ರಾಮದುರ್ಗ
P.W.D.CODE PARA - 133
Name of Work : Annual Maintanace of Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24 in Ramdurg Taluka for the year 2026-27
This is to certify that,Shri.Ravikumar N, Assistant Executive Engineer, have personally visited spot and prepared the estimate using sanctioned scheduled of rates provided for the most economical and safe way of executing work.
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg
C E R T I F I C A T E.
(As required vide G.O.No.PWD SL.CMS.96 Dtd:27/6/1991)
Certified that, sufficient care has been taken while preparaing the estimate in respect of the above mentioned work to see that all necessary items which are technically required for the work in sufficient quantity are included while preparing the estimate,and specification of items included are completed and correct.
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg
C E R T I F I C A T E.
Certified that, the work proposed in this estimate has not been taken up under any other head/programme by any agency. The said work has not been included / proposed / over lapped in any other proposed or approved programme.
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg
Name of Work : Annual Maintanace of Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24 in Ramdurg Taluka for the year 2026-27
RECAPTULATION SHEET
Sl.no P a r t I c u l a r s A m o u n t
1 Maintenance of Road 486947.96
2 Road Furnitures 20141.04
3 MISC AND ROUND OFF 1634.98 1634.92
SAY Rs:-(Laks) 6.00
PWD/2026-27/RD/WORK_INDENT42085
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg Executive Engineer, PWD,Belgaum Dn.Belgaum
Name of Work : Annual Maintanace of Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24 in Ramdurg Taluka for the year 2026-27
S.No Item Qty Unit Rate Amount
Road Maintenance
1 Clearing and Grubbing Road Land-Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness By Mechanical Means using Motor Grader- In area of light jungle (P.No. 9, I.No. 2.5a , Vol-3) 134.88 100 m2 393.00 53007.84
2 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Note: The earth stripped from earthen shoulders to be dumped on the side slopes locally for disposal (P.No. 91, I.No. 10.3, Vol-3) 562.00 sqm 39.00 21918.00
3 The maintenance of drains include erosion,repair,clearing,cleaning,reshaping,regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (P.No. 147, I.No. 16.19, Vol-3) 562.00 m 6.00 3372.00
4 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost isinclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (P.No. 93, I.No. 10.15(i), Vol-3) 525.55 Sqm 388.00 203913.40
5 Patching of Deep Potholes using WBM Gr lI & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with Type-B Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.(P.No. 93, I.No. 10.15(ii), Vol-3) 279.00 Sqm 635.00 177165.00
7 Water Bound Macadam Providing, laying, spreading and compacting stone aggregates ofspecific sizes to water bound macadam specification includingspreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means (ii) Grading-II (53 mm to 22.4 mm)(a) Using Screening Crushable type such as Moorum or Gravel 11.24 Cum 2453.00 27571.72
Total: 486947.96
8 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Painting two coats with synthetic enamel paint.[I.No.16.24(i) / Page-148 of PWD SR (Vol. 3) 2023-24] 11.00 km 206.00 2266.00
9 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade.[I.No.16.24(ii) / Page-148 of PWD SR (Vol. 3) 2023-24] 10.00 km 1135.00 11350.00
10 White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications..[I.No.-16.26/ Page- 148 of PWD SR (Vol. 3) 2023-24] 241.67 Sqm 27.00 6525.04
11 Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. MORTH Specification No.801 (A) Retro-Reflectorised Traffic Signs (ii) 90cm equilaterial triangle (P.No. 53, I.No.8.5 , Vol-3) 0.00 No 3591.00 0.00
Total Rs:- 507089.00
Road Maintenance (Total):- 507089.00
Assistant Executive Engineer
PWD,Sub-Dn.,Ramdurg
Name of Work : Annual Maintanace of Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24 in Ramdurg Taluka for the year 2026-27
S.No Item Nos Measurements Qty Unit
For Maintenance Length 4.55 11.24 6.69 more than 5 years
0.00 2.10 2.10 less than 5 years
Total Maintenance Length 11.24
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 11.24
I) ROAD MAINTENANCE
1 Clearing and Grubbing Road Land-Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness By Mechanical Means using Motor Grader- In area of light jungle (P.No. 9, I.No. 2.5a , Vol-3)
Aneguddi hanamapur Chennapur road from km 0.00 to 4.55 & 4.55 to 5.80 & 5.80 to 11.24
Maintanance length 11.24 kms
Deduct 40% voids -8992.00
Deduct village limits
Aneguddi hanamapur Chennapur road from km 0.00 to 4.55 & 4.55 to 5.80 & 5.80 to 11.24
Maintanance length 11.24 kms
Deduct 60% voids -20232.00
Deduct village limits
Grand Total 13488.00 sqm
say in 100 sqm 134.88 100 sqm
2 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Note: The earth stripped from earthen shoulders to be dumped on the side slopes locally for disposal (P.No. 91, I.No. 10.3, Vol-3)
Aneguddi hanamapur Chennapur road from km 0.00 to 4.55 & 4.55 to 5.80 & 5.80 to 11.24
for maintenance as above 1 5% 11240.00 1.000 562.00
Total: 562.00 sqm
3 The maintenance of drains include erosion,repair,clearing,cleaning,reshaping,regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (P.No. 147, I.No. 16.19, Vol-3)
Aneguddi hanamapur Chennapur road from km 0.00 to 4.55 & 4.55 to 5.80 & 5.80 to 11.24
for maintenance as above 1 5% 11240.00 1.000 562.00
Total: 562.00 mtr
4 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost isinclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (P.No. 93, I.No. 10.15(i), Vol-3)
Aneguddi hanamapur Chennapur road from km 0.00 to 4.55 & 4.55 to 5.80 & 5.80 to 11.24
Total: 525.55 sqm
5 Patching of Deep Potholes using WBM Gr lI & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with Type-B Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.(P.No. 93, I.No. 10.15(ii), Vol-3)
Aneguddi hanamapur Chennapur road from km 0.00 to 4.55 & 4.55 to 5.80 & 5.80 to 11.24
Total: 279.00 sqm
6 Water Bound Macadam Providing, laying, spreading and compacting stone aggregates ofspecific sizes to water bound macadam specification includingspreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means (ii) Grading-II (53 mm to 22.4 mm)(a) Using Screening Crushable type such as Moorum or Gravel
Aneguddi hanamapur Chennapur road from km 0.00 to 4.55 & 4.55 to 5.80 & 5.80 to 11.24 1 0.1% 11240.00 11.24 cum
Total: 11.24 cum
8 Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom-Tack coat on Bituminous surface (P.No. 43 I.No.5.32, Vol-3)
9 Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. (P.No. 43, I.No. 5.31. Vol-3)
I) ROAD FURNITURE
7 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Painting two coats with synthetic enamel paint.[I.No.16.24(i) / Page-148 of PWD SR (Vol. 3) 2023-24]
Aneguddi hanamapur Chennapur road from km 0.00 to 4.55 & 4.55 to 5.80 & 5.80 to 11.24
8 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade.[I.No.16.24(ii) / Page-148 of PWD SR (Vol. 3) 2023-24]
Aneguddi hanamapur Chennapur road from km 0.00 to 4.55 & 4.55 to 5.80 & 5.80 to 11.24
9 White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications..[I.No.-16.26/ Page- 148 of PWD SR (Vol. 3) 2023-24]
Aneguddi hanamapur Chennapur road from km 0.00 to 4.55 & 4.55 to 5.80 & 5.80 to 11.24
Total: 241.67 Sqm
13 Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. MORTH Specification No.801 (A) Retro-Reflectorised Traffic Signs (ii) 90cm equilaterial triangle (P.No. 53, I.No.8.5 , Vol-3)
Aneguddi hanamapur Chennapur road from km 0.00 to 4.55 & 4.55 to 5.80 & 5.80 to 11.24
Assistant Executive Engineer Executive Engineer
PWD,Sub-Dn.,Ramdurg PWD, Div.Belgaum.
Name of Work : Annual Maintanace of Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24 in Ramdurg Taluka for the year 2026-27
S.No Description of items Unit UNI S.R.2024-25 Rate as per S.R. Diff.in cost of Cement. Total Rate
P.No. Vol I.No . Const Diff.in cost Amount
ROAD MAINTENANCE
1 Clearing and Grubbing Road Land-Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness By Mechanical Means using Motor Grader- In area of light jungle (P.No. 9, I.No. 2.5a , Vol-3) 100 m2 9 3 2.5a 393.00 393.00
2 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Note: The earth stripped from earthen shoulders to be dumped on the side slopes locally for disposal (P.No. 91, I.No. 10.3, Vol-3) sqm 91 3 10.3 39.00 39.00
3 The maintenance of drains include erosion,repair,clearing,cleaning,reshaping,regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (P.No. 147, I.No. 16.19, Vol-3) m 147 3 16.19 6.00 6.00
4 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (P.No. 93, I.No. 10.15(i), Vol-3) Sqm 93 3 10.15(i) 388.00 388.00
5 Patching of Deep Potholes using WBM Gr lI & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with Type-B Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.(P.No. 93, I.No. 10.15(ii), Vol-3) Sqm 93 3 10.15(ii) 635.00 635.00
6 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. cum 91 3 10.2 97.00 97.00
7 Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification includingspreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means (ii) Grading-II (53 mm to 22.4 mm) (a) Using Screening Crushable type such as Moorum or Gravel Cum 26 3 4.13 2453.00 2453.00
8 Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom-Tack coat on Bituminous surface (P.No. 43 I.No.5.32, Vol-3) sqm 43 3 5.32 12.00 12.00
I) ROAD FURNITURE
10 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Painting two coats with synthetic enamel paint.[I.No.16.24(i) / Page-148 of PWD SR (Vol. 3) 2023-24] km 148 3 16.24(i) 206.00 206.00
11 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade.[I.No.16.24(ii) / Page-148 of PWD SR (Vol. 3) 2023-24] km 148 3 16.24(ii) 1135.00 1135.00
12 White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications..[I.No.-16.26/ Page- 148 of PWD SR (Vol. 3) 2023-24] Sqm 148 3 16.26 27.00 27.00
13 Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. MORTH Specification No.801 (A) Retro-Reflectorised Traffic Signs (ii) 90cm equilaterial triangle (P.No. 53, I.No.8.5 , Vol-3) No 53 3 8.5. a.2 3591.00 3591.00
14 Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. MORTH Specification No, 803. Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (P.No. 57, I.No. 8.15 , Vol-3) Sqm 57 3 8.15 478.00 478.00
15 Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (P.No. 150, I.No.21.c.1 , Vol-3) No 150 3 21.c.1 365.00 365.00
16 Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Ref MoRTH specification 801. Direction and Place Identification Signs upto 0.9 m2 Size Board. (P.No. 55, I.No. 8.7 , Vol-3) Sqm 55 3 8.70 8068.00 8068.00
Assistant Executive Engineer Executive Engineer
PWD,Sub-Dn.,Ramdurg PWD, Div.Belgaum.
Name of the Road :-ANEGUDDI - HANAMAPUR - CHANNAPUR (MDR)(RIS ID-RMG220)
Road Category: MDR Sub Division : RAMDURG Division : BELGAVI Circle : DHARWAD
ANEGUDDI CROSS ANEGUDDI HANAMAPUR CHENNAPUR CROSS
Carriage Way 5.50 m
Carriage Way 5.50 m WI(114308) under 5054 GSB-150mm,WMM-225mm-BM-50mm,SDBC-25mm For the year 2019-20 WI(128510) under 5054 GSB-200mm,WMM-225mm-BM-50mm,SDBC-25mm For the year TSP 2022-23 WI(153386) under 5054 GSB-200mm,WMM-225mm-BM-50mm,SDBC-25mm For the year 2022-23 More than 5 years MAINTENANCE WORK FOR THE YEAR OF 2026-27
3.75 m MAINTENANCE WORK FOR THE YEAR OF 2026-27
Last 5 Year development length 2026-27 Last 5 Year development length 2026-27 Last 5 Year development length 2026-27 MAINTENANCE WORK FOR THE YEAR OF 2026-27
Structure Chainage
Legends Desciption Silent Features 3).Proposed works under Annual Works 2025-26 2).Maintenance for 2026-27 Village/City Limit
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Name of Village/ City From To L (in Km)
Maintenance Works Under Annual Plan 2026-27 Single Lane 4.55 to 5.80 1.25 APPENDIX-E 0.00 0.00 RC 0.00 Last 5 Year development length 2024-25 0.00 2.10 Maint 2.10 aneguddi 2.92 3.40 0.49
Last 5 Year development length 2026-27 Intermediate lane 0.00 to 4.55, 5.80 to 11.24 9.99 0.00 0.00 RC 0.00 Last 5 Year development length 2024-25 2.10 2.92 Maint 0.82 Hanampur 6.00 6.40 0.400
Work Approved / progress 2026-27 Two lane 0 0.00 0.00 0.00 CC Road 0.00 Last 5 Year development length 2024-25 2.92 4.55 Maint 1.64 0.00
Works Eligible for Renewal Two lane + PS 0 0.00 Total Length (in Km) 0.00 More than 5 years Maintenance Work 4.55 11.24 Maint 6.69 0.00
Major Bridges Four lane 0 0.00 4). On going works Total Length (in Km) 11.24 0.00
Minor Bridges Major Bridges 0 HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) 0.00
CD Minor Bridges 0 SCP 0.00 0.00 Wd 0.00 Total Length (in Km) 0.89
Village/ City Name Railway Crossing 0 0.00 0.00 RC 0.00
Railway Crossing Overlap Length 0 0.00 0.00 0.00 CC Road 0.00
Total Length (in Km) 11.24 Total Length (in Km) 0.00
5). Eligible for Renewal
2026-27 Maintenance Abstract 1). Completed Works and under DLP HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
Description Length in KM HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) APPENDIX-E Renewal 0.00 0.00 Ren 0.00 No. Details Length Other Department Works
Last 5 Year development length 4.55 0.00 0.00 RC 0.00 1 1). Completed Works and under DLP 0.00 Under From To L (in Km)
0.00 0.00 RC 0.00 2 2).Maintenance for 2026-27 11.24 KRDCL 0.00
More than 5 Year development length 6.69 0.00 3 3).Proposed works under Annual Works 2025-26 0.00 KSHIP 0.00
0.00 4 4). On going works 0.00 SHDP 0.00
Total Maintenance Length 11.24 Total Length (in Km) 0.00 5 5). Eligible for Renewal 0.00 Total Length (in Km) 0.00
Total Length (in Km) 11.24
Total length of the road 11.24
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
2026-27 Aneguddi hnmpur Chennapur road- MDR -.xlsx
Others - estimate • 0.09 MB
MDR approved programme letter.pdf
Others - MDR approved programme • 1.94 MB
3054 mdr program 2026-27.pdf
Others - 3054 mdr program 2026-27 • 0.66 MB
42085 BID DOC GEN KW-1.doc
Tender Document • 1.60 MB
Formats and govt GOs.zip
Others - Formats and govt GOs • 20.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .