| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.5 LAdmitted-Finance | -19.78% | ₹18.5 L | L1 | Admitted-Finance |
| 2 | L2₹19.8 L+₹1.3 L (7.22%)Admitted-Finance | -13.99% | ₹19.8 L+₹1.3 L (7.22%) | L2 | Admitted-Finance |
| 3 | L3₹19.9 L+₹1.4 L (7.77%)Admitted-Finance | -13.55% | ₹19.9 L+₹1.4 L (7.77%) | L3 | Admitted-Finance |
| 4 | L4₹20.5 L+₹2.0 L (10.7%)Admitted-Finance KALIJHORA KALIJHORA BAZAR KALIJHORA BAZAR KALIJHORA BAZAR DARJEELING WEST BENGAL 734008 | DARJEELING | WEST BENGAL | 734008 | -11.17% | ₹20.5 L+₹2.0 L (10.7%) | L4 | Admitted-Finance |
| 5 | L5₹21.0 L+₹2.5 L (13.6%)Admitted-Finance | -8.86% | ₹21.0 L+₹2.5 L (13.6%) | L5 | Admitted-Finance |
Tender Value
₹23.1 L
EMD Value
₹46,100
Closing Date
14 May 2026, 5:00 pmClosed
Executive Officer, Municipal Board, Mangrol
Executive Officer, Municipal Board, Mangrol
Construction of C.C. Road Brijraj Suman House to Surajmal Suman Shop (Bamori Road).
2026_DLB_556126_3
01/2026-27 (623-627/30.04.2026)
Open Tender
Civil Works
Percentage
180 days
Mangrol
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Executive Officer, Municipal Board, Mangrol
₹46,100
Yes
27 May 2026
4 May 2026
15 May 2026
4 May 2026
14 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 36 | Cum. | 229.5 | ₹8,262 |
| 2 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 486 | Cum. | 178.5 | ₹86,751 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 19.8 | Cum. | 4,575 | ₹90,585 |
| 4 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 4.56 | Cum. | 4,860 | ₹22,161.6 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 19.21 | Cum. | 5,510 | ₹1,05,847.1 |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 360 | Sqm. | 367 | ₹1,32,120 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 54 | Cum. | 5,910 | ₹3,19,140 |
| 8 | Providing, laying, spreading and compacting of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion. Grading - III Material | 216 | Cum. | 1,360 | ₹2,93,760 |
| 9 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manualy, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 108 | Cum. | 3,030 | ₹3,27,240 |
| 10 | Providing and laying un-reinforced, plain cement concrete mix with Concrete Mixer & vibrator pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed as per approved mix design, laid, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints etc including all material, labour, machinery, lighting, guarding and maintenance of diversion. PCC M-20 | 162 | Cum. | 5,650 | ₹9,15,300 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
TechnicalRequirment3.pdf
Tender Documents • 0.23 MB
BOQ_990384.xls
BOQ • 0.29 MB
Corrigendum.pdf
PDF • 1.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .