Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAdmitted-Finance | ₹34.0 L | L1 | Admitted-Finance |
| 2 | L1₹34.0 LAdmitted-Finance RANGAPAHAR RAILWAY CROSSING GATE NO 1 DIMAPUR 797112 NAGALAND | DIMAPUR | NAGALAND | 797112 | ₹34.0 L | L1 | Admitted-Finance |
| 3 | L2₹34.9 L+₹83,997.25 (2.47%)Admitted-Finance | ₹34.9 L+₹83,997.25 (2.47%) | L2 | Admitted-Finance |
| 4 | L3₹36.0 L+₹1.9 L (5.67%)Admitted-Finance | ₹36.0 L+₹1.9 L (5.67%) | L3 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Having appropriate category and one class below. However, value of balance work in hand is more than five time tendering limit, hence rejected |
| Sl No | Description | Qty | Unit | K K CONSTRUCTION L1 | MAURYA CONSTRUCTIONS L1 | Shri B K Ukil L2 | M/S SANGITA TRADERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Concrete (unreinforced) in ground floors and pavings not exc 15 cm thickness (below or above ground level) complete all as specified and as directed. | 14.25 | Cum | 1,900 ₹27,075 Lowest | 1,900 ₹27,075 Lowest | 1,950 ₹27,787.5 | 2,000 ₹28,500 |
| 2.00 | Material & Labour for 25 mm thick PCC 1:2:4, Type B-0 using 12.5mm graded stone aggregate as in sub base of flooring, surface finished even and rough to receive the topping layer complete all as specified and as directed. | 190 | Sqm | 295 ₹56,050 Lowest | 295 ₹56,050 Lowest | 299 ₹56,810 | 300 ₹57,000 |
| 3.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding removing tiles frm site and rubbish off the premises complete all as specified and as directed. | 30 | Sqm | 140 ₹4,200 Lowest | 140 ₹4,200 Lowest | 145 ₹4,350 | 144 ₹4,320 |
| 4.00 | Material & Labour for joint free non skid ceramic coloured tiles 7 to 8mm thick (square /rectangular) of premium quality, area of each tile exceeding 0.11 sqm but not exc 0.18sqm in floors etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match including screed bed of mortar 15 mm thick in Cement Mortar 1:4 complete all as specified and as directed.
Note: The colour / shade / design of tiles shall be as approved by AGE(I). | 190 | Sqm | 1,875 ₹3,56,250 Lowest | 1,875 ₹3,56,250 Lowest | 1,879 ₹3,57,010 | 1,900 ₹3,61,000 |
| 5.00 | Material & Labour glazed ceramic coloured tiles 450X 300X 7mm thick of premium quality on skiriting/dado, set & jointed in neat cement slurry & pointed with white/coloured to match over backing coat of 10mm thick in Cement Mortar 1:3 complete all as specified and as directed.
Note: The colour / shade / design of tiles shall be as approved by AGE(I). | 30 | Sqm | 1,950 ₹58,500 Lowest | 1,950 ₹58,500 Lowest | 2,000 ₹60,000 | 1,990 ₹59,700 |
| 6.00 | Dismantling of Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 336 | Sqm | 65 ₹21,840 Lowest | 65 ₹21,840 Lowest | 75 ₹25,200 | 75 ₹25,200 |
| 7.00 | Supply and fixing suspended false ceiling using E-grid 2430 180 GSM (exposed ceiling suspension system) of grid size 600mm x 600mm with main runner 38mm x 24 mm and wall angle 24mm x 24 mm using 4 mm thick High Pressure Non asbestos Fibre Cement pre painted decorative board (E-board Classic) in a grid of GI system duly suspended with 4 mm dia GI wire hanger fixed with steel dash fasteners or iron purlin from the roof with adjustment clip providing position for light fixtures, air conditioning diffusers and ducts, sprinkler, smoke detectors etc. The main runner to be secured to structural soffit by hangers @ 1220 mm maximum c/c. The last hanger at the end of each main runner should not be placed at more than 450 mm from the adjascent wall, Flush fitting 1220 mm cross Tee to be interlocked between main runners @ 610 mm c/c so as to form 600mm x 600mm grid complete all as specified and as directed. | 300 | Sqm | 1,270 ₹3,81,000 Lowest | 1,270 ₹3,81,000 Lowest | 1,290 ₹3,87,000 | 1,400 ₹4,20,000 |
| 8.00 | Supply and fixing 4 mm thick,Plywood, grade BWR, type BB, fixed with screws to timber frame work complete all as specified and as directed. | 36 | Sqm | 790 ₹28,440 Lowest | 790 ₹28,440 Lowest | 800 ₹28,800 | 798 ₹28,728 |
| 9.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 2 | Cum | 2,450 ₹4,900 Lowest | 2,450 ₹4,900 Lowest | 2,455 ₹4,910 | 2,500 ₹5,000 |
| 10.00 | M & L for brick work in half brick thick walls using old size 'B' bricks straight or curved on plan to any radius built in Cement Mortar 1:4 including 2 Nos of 6mm dia bars at every fourth course of brick work complete all as specified and as directed. | 10 | Sqm | 1,200 ₹12,000 Lowest | 1,200 ₹12,000 Lowest | 1,300 ₹13,000 | 1,250 ₹12,500 |
Tender Value
₹32 L
EMD Value
₹64,000
Closing Date
3 Aug 2026, 6:00 pmClosed
COL AMIT CHAUBEY
Lt Col Shayama Prabha
SPL REPAIR TO BUILDING NO T-208 T-209 T-214 BCD AND T-614 OF XXXXXX AT ZAKHAMA MILITARY STATION.
2026_MES_764986_2
8143/E8
Open Tender
Civil Works
Item Rate
180 days
Zakhama
As per Tender Document
6 documents required · 6 mandatory
₹500
AGE(I) ZAKHAMA
₹64,000
21 Aug 2026
13 Jul 2026
10 Aug 2026
13 Jul 2026
3 Aug 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Concrete (unreinforced) in ground floors and pavings not exc 15 cm thickness (below or above ground level) complete all as specified and as directed. | 14.25 | Cum | - | - |
| 2 | Material & Labour for 25 mm thick PCC 1:2:4, Type B-0 using 12.5mm graded stone aggregate as in sub base of flooring, surface finished even and rough to receive the topping layer complete all as specified and as directed. | 190 | Sqm | - | - |
| 3 | Dismantling floor, hearth or wall tiling including cement mortar bedding removing tiles frm site and rubbish off the premises complete all as specified and as directed. | 30 | Sqm | - | - |
| 4 | Material & Labour for joint free non skid ceramic coloured tiles 7 to 8mm thick (square /rectangular) of premium quality, area of each tile exceeding 0.11 sqm but not exc 0.18sqm in floors etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match including screed bed of mortar 15 mm thick in Cement Mortar 1:4 complete all as specified and as directed.
Note: The colour / shade / design of tiles shall be as approved by AGE(I). | 190 | Sqm | - | - |
| 5 | Material & Labour glazed ceramic coloured tiles 450X 300X 7mm thick of premium quality on skiriting/dado, set & jointed in neat cement slurry & pointed with white/coloured to match over backing coat of 10mm thick in Cement Mortar 1:3 complete all as specified and as directed.
Note: The colour / shade / design of tiles shall be as approved by AGE(I). | 30 | Sqm | - | - |
| 6 | Dismantling of Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 336 | Sqm | - | - |
| 7 | Supply and fixing suspended false ceiling using E-grid 2430 180 GSM (exposed ceiling suspension system) of grid size 600mm x 600mm with main runner 38mm x 24 mm and wall angle 24mm x 24 mm using 4 mm thick High Pressure Non asbestos Fibre Cement pre painted decorative board (E-board Classic) in a grid of GI system duly suspended with 4 mm dia GI wire hanger fixed with steel dash fasteners or iron purlin from the roof with adjustment clip providing position for light fixtures, air conditioning diffusers and ducts, sprinkler, smoke detectors etc. The main runner to be secured to structural soffit by hangers @ 1220 mm maximum c/c. The last hanger at the end of each main runner should not be placed at more than 450 mm from the adjascent wall, Flush fitting 1220 mm cross Tee to be interlocked between main runners @ 610 mm c/c so as to form 600mm x 600mm grid complete all as specified and as directed. | 300 | Sqm | - | - |
| 8 | Supply and fixing 4 mm thick,Plywood, grade BWR, type BB, fixed with screws to timber frame work complete all as specified and as directed. | 36 | Sqm | - | - |
| 9 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 2 | Cum | - | - |
| 10 | M & L for brick work in half brick thick walls using old size 'B' bricks straight or curved on plan to any radius built in Cement Mortar 1:4 including 2 Nos of 6mm dia bars at every fourth course of brick work complete all as specified and as directed. | 10 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_871562.xls
BOQ • 0.30 MB
8143tenderdoc.pdf
Tender Documents • 1.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .